Information
-
Document No.0001
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
TIMES PLANT IS READY
-
TIME THE PLANT IS READY FOR US TO CLEAN
-
TIME THE PLANT IS READY FOR INSPECTION
-
TIME THE PLANT IS READY FOR PRODUCTION
-
COMMENTS:
CUT UP 1.0
-
1.1 TABLES <br><br>
-
1.2 GRAY BACS<br><br>
-
1.3 BLUE & BLACK SKIDS<br>
-
1.4 MULTI CONVEYORS MACHINE <br>
-
1.5 CUT UP MACHINE <br>
-
1.6 MSM MACHINE
-
1.7 CUTTING BOARD
-
1.8 KNIFE HOLDERS
-
1.9 KNIFE CAGES
-
1.10 MSM CONVEYORS
-
1.11 WALLS
-
1.12 CEILING
-
1.13 REFERS
-
1.14 DRAINS <br>
-
1.15 LIGHTS
-
TIME THE PLANT IS READY TO CLEAN
2.0 TRAY PAK
-
2.1 SMALL TUMBLERS
-
2.2 SMALL INJECTORS
-
2.3 CUTTING BOARD
-
2.4 TRAY PACK CONVEYORS 3
-
2.5 SS TABLE BACS
-
2.6 BLUE/BACK/SKIDS
-
2.7 ANTI FATIGUE MATS
-
2.8 SS TABLES
-
2.9 PACKING MACHINES
-
2.10 STANDS (LOW) & (HIGH)
-
2.11 FLOOR
-
2.12 WALLS
-
2.13 DRAINS
-
2.14 REEFERS
-
2.15 LIGHTS
-
2.16 CEILING
-
TIME THE PLANT IS READY TO CLEAN
COOLERS
-
8.0 SHIPPING/RECEIVING<br>
-
9.0 CHEMICAL ROOM
-
7.0 COOLERS 401
-
11.0 COOLER 402
-
12.0 COOLER 403
-
13.0 COOLER 404
-
14.0 COOLER 405
-
15.0 COOLER 406
-
18.0 FREEZERS ROOM
-
TIME THE PLANT IS READY TO CLEAN
10.0 WELFARE
-
10.2 WELFARE CERICOLA
-
TIME THE PLANT IS READY TO CLEAN
19.0 BBQ
-
19.1 ANTI FATIGUE MAT
-
19.2 DUMPER
-
19.3 SMALL CONVEYORS
-
19.4 BIG CONVEYORS
-
19.5 BBQ SPREADERS
-
19.6 BBQ SPREADERS CREW
-
19.7 TUMBLERS
-
19.8 SS CONVEYORS
-
19.9 CHICKEN HANDLE
-
19.10 SS ROLLERS
-
19.11 SS TABLES
-
19.12 GREY BACS
-
19.13 WHITE BACS
-
19.14 BEIGE BACS
-
19.15 TUMBLERS
-
19.16 PACKING MACHINE
-
19.17 WHITE CUTTING BOARD
-
19.18 SKIDS
-
19.19 FLOOR
-
19.20 WALLS
-
19.21 DRAINS
-
19.22 CEILING
-
19.23 REEFER
-
19.24 LIGHTS
-
NOTES:
-
TIME THE PLANT IS READY TO CLEAN
-
PCI SUPERVISOR SIGNATURE