Title Page
-
Work Site
-
Site Location Plots/Area
-
Prepared by
Permit Request
-
Work Activity Title (Description)
-
Specified high-risk work tasks covered to work by this permit
-
Start of Work
-
Duration of Permit
Service Drawings
-
Have Site inductions and RAMS been briefed and signed
-
Are on-site service drawings available and have operatives carrying out the works been briefed on existing services.
CAT & Gennie
-
Does at least one of the team hold a valid in date (3 years) CAT & Genny qualification?
-
CAT & Genny Serial Number
-
CAT & Genny Calibration Date
Trial Holes
-
For identified services, have trial holes been dug by hand to ascertain service depths?
-
Will hand digging with insulated tools be used when digging trial holes?
-
What services were found?
-
What depths where services located?
-
Have service routes been marked with paint/pins?
-
Are works deemed safe to proceed?
-
Full Name and Signature of Supervisor
Safe Trench/Excavation Practices
-
Are Trench boxes being used for these works exceeding 1.2m?
-
Will shallow excavations be stepped or battered back?
-
When digging around services, will insulated tools be used?
Plant & Equipment
-
Has all plant undergone a weekly inspection?
-
Are all operatives trained to operate plant?
Works briefed and Explained
-
Full Name and Signature of Supervisor
-
Full Name and Signature of Excavator Operator
-
Full Name and Signature of Other Operatives
-
Full Name and Signature of Other Operatives
-
Full Name and Signature of Other Operatives
Completion of Works Sign-off
-
Full Name and Signature of Supervisor
-
General Comments