Title Page
-
Site conducted
-
Client / Site
-
Conducted on
-
Inspected by
-
Position
-
Address
Information
-
Equipment
-
Voltage
-
Site Contact
-
Company
-
Tel No.
Section (A) Quality
-
1.1 Is there a QR code sticker on site
-
1.2 Is the Edina Log Book on site
-
1.3 Are there evidence of Client Site Rules on display
-
1.4 Is there evidence of Site Health and Safety Induction Completed
-
1.5 Is the Edina P&ID as built (Piping & Instrumentation Diagram) & Terminations
-
1.6 All relevant technical manuals available / available on T-Drive
-
1.7 Are the correct amount of predictive analysis wear oil sample bottles on site
-
1.8 Are the Fire alarms calibrated
-
1.9 Are the Gas alarms calibrated
-
2.0 Are all T.E.M Units & COMAP systems clear of alarms
-
2.1 Are all relevant Edina spares & equipment on site
-
2.2 Are Coolant pump hoses and equipment present on site
-
2.3 Is a Transformer 110 Volt centre tapped to earth (55 volt) on site
-
2.4 Is there a wet & Dry VAC on site / Engineers Van
-
2.5 Are all electrical items PAT tested where required
-
2.6 Are correct Edina tools and service equipment on sit6
-
2.7 Are Edina Emergency Callout notices displayed
-
2.8 Is an Edina Lock-Off Station available on site
-
Conclusions & Recommendations
Section (B) Environmental
-
2.9 Is there a Suitably Quantity of Emergency Spill Response Equipment on site
-
3.0 Are Absorbent spill matts in control room/engineer’s vehicle
-
3.1 Are Oil & waste rag bins on site with lids securely fastened
-
3.2 Are the Oil & waste rag bins stored on bund
-
3.3 Do the Oil & waste rag bins have a rainproof cover
-
3.4 Is there a Suitably sized bunded glycol tank on site
-
3.5 Hazardous waste transfer notes on site / sent to relevant office
-
3.6 Are internal oil storage tanks in good condition
-
3.7 Are external oil storage tanks in good condition
-
3.8 Are external oil storage tanks bunded to 110%
-
3.9 Are tank and pipework gauges and hydrostatic indicators working correctly
-
4.0 Are all valves & pipework in good condition C/W identification labels
-
4.1 Have oil & antifreeze leaks been addressed
-
4.2 Are any watercourse's sited a suitable distance away so as not to be an issue if there where an oil spill
-
4.3 Are surface water drains a suitably safe distance from the container
-
4.4 Are all generator / CHP acoustic protections in place
-
4.5 Are all input & output attenuation in good condition
-
4.6 Are all silencers in good condition
-
4.7 Have all redundant components been removed from site
-
4.8 Have all redundant 205L drums been removed from site
-
Conclusions & Recommendations
Section (C) Health & Safety
-
4.9 Is there safe access and egress onto the site
-
5.0 Is there safe access to the container / canopy / plant room.
-
5.1 Does the induction identify any potential hazards on site
-
5.2 Are these adequately controlled
-
5.3 Are there heavy plant movements within the vicinity of the container
-
5.4 Are there designated traffic routes for these
-
5.5 Are there designated pedestrian routes
-
5.6 Are all control room / container / plant room lights functional
-
5.7 Is the control panel free from defects
-
5.8 Are all Edina & Mandatory safety signs in place
-
5.9 Are all slip or trip hazards within the container / canopy / plant room adequately controlled
-
6.0 Are all cable and control looms secured and fastened correctly
-
6.1 Are external cable cubicles in good condition
-
6.2 Are the cable entry ducts adequately sealed in the control room
-
6.3 Are components secured to prevent vibration damage to fixed / rotating components
-
6.4 Are all prime mover / alternator guards in place & secure
-
6.5 Are all ancillary pumps and motors free from defects
-
6.7 Are all heat shields and guards around turbo and exhaust in good condition
-
6.8 Has any ingress of dust or insect debris been effectively addressed
-
6.9 Is the ladder access to the roof protected by a ladder guard
-
7.0 Are the container lifting beams in good condition
-
7.1 Do the lifting beams have W.L.L Working Load Limit identified
-
7.2 Are all materials stored in container / plant room on Edina COSHH Register
-
7.3 Are all door handles & locks working properly
-
7.4 Are all emergency stops in good condition
-
7.5 Engineers Tools & Equipment on company vehicle stored correctly
-
7.6 Engineers vehicle in a reasonably clean and serviceable condition
-
Conclusions & Recommendations
Section (D) Hygiene & Welfare
-
7.7 Are welfare facilities available
-
7.8 1st aid kit available (stocked & in date)
-
7.9 Is the area free from Rubbish or Waste Materials
-
Conclusions & Recommendations
Section (E) Short Term Operating Reserve Site(s)
-
8.0 Fire extinguishers in calibration
-
8.1 Gas boiler service/inspection date
-
8.2 Air compressor service/inspection date
-
Conclusions & Recommendations
Section (F) SHEQ Site Inspection Acceptance
-
The above SHEQ Site Inspection has been carried out by a member of the SHEQ Dept. and hereby submitted to the appropriate Department Line Manager for follow-up and closure of the corrective actions as detailed.
-
Inspector (Name and Signature)