Title Page
-
Site conducted
-
Select the template title
- 104-HS-003 - Post Commissioning Site Safety Inspection
-
Client / Site
-
Conducted on
-
Inspected by
-
Position
-
Address
Information
-
Equipment
-
Voltage
-
Site Contact
-
Company
-
Tel No.
Section (A) On Site Access Safety
-
1.0 Can the Edina Operations Engineer access the place of work safely
-
1.1 Is there suitable access lighting
-
1.2 Are the access routes in good condition
-
1.3 Is there parking space available for an Edina Service vehicle
-
1.4 Is there a procedure in place to allow an Edina Operations Engineer access to equipment outside of normal working hours
-
1.5 Are all areas of the CHP / generator compound correctly fenced off
-
1.6 Are there any trip hazards in the vicinity of the Container
-
1.7 Are there any uneven ground conditions around the container
-
Conclusions & Recommendations
Section (B) On Site Container Access Safety
-
1.8 Is the entrance height of the container safe
-
1.9 Is the height of the concrete plinth safe
-
2.0 Are the ground conditions around the container safe
-
2.1 Can photographs or drawings be provided
-
Conclusions & Recommendations
Section (C) On Site Container High Access Safety
-
2.2 Has the ladder been fitted with a ladder guard
-
2.3 Has the ladder guard been fitted with a padlock and caution notice
-
2.4 Is the ladder gate at the top operating correctly
-
2.5 Has the ladder gate been fitted with an end stop
-
2.6 Are all fixtures in good working order
-
2.7 Is there a suitable guard rail system on top of the container
-
Conclusions & Recommendations
Section (D) On Site Mandatory Warning Notices & Emergency Contacts
-
2.8 Is the standard Edina multiple hazard information sign displayed
-
2.9 Is the regional Edina emergency contacts information displayed
-
3.0 Are the emergency escape signs correctly placed
-
3.1 Is there a muster point identified on site in the event of an emergency
-
Conclusions & Recommendations
Section (E) Pipeline & Cable Identification Marking
-
3.2 Are the gas pipes correctly identified
-
3.3 Is the direction of gas flow correctly identified
-
3.4 Are lubricating oil pipelines indicated with brown labelling
-
3.5 Are lubricating oil pipelines indicated with direction of flow
-
3.6 Are air start pipes identified with blue labelling
-
3.7 Are the water pipes correctly identified
-
3.8 Are the water pipes indicated with direction of flow
-
3.9 Are LV cables correctly identified
-
4.0 Are the HV cables correctly identiifed
-
Conclusions & Recommendations
Section (F) Portable Appliance Testing & Asset Management Systems
-
4.1 Are all portable 240 & 110 Volt tools & equipment PAT tested
-
4.2 Are PAT tested items displaying an Asset ID number
-
4.3 If an item has failed it's PAT test is it displaying a failed / Do Not Use / Quarantined label
-
4.4 Are any on site ladders displaying a ladder TAG
-
4.5 Are the lifting beams displaying the Safe Working Load
-
Conclusions & Recommendations
Section (G) Edina Documentation & Client Documentation / Procedures
-
4.6 Is there a QR Code sticker on site
-
4.7 Is there an Edina Log Book On Site
-
4.8 Is there evidence of client site rules available
-
4.9 Does the site conduct site specific inductions
-
5.0 Are there areas on site that are separate from the standard induction i.e. High Voltage areas - If not click N/A
-
Conclusions & Recommendations
Section (H) Equipment Defects / Omissions
-
5.1 Is the control room free from any visible defects
-
5.2 Are the cable trays and cable harnesses free from any visible defects
-
5.3 Is the alternator free from any visible defects
-
5.4 Is the prime mover free from any visible defects
-
5.5 Are the pipes and pumps free from visible defects
-
5.6 Is the exhaust / silencer system free from visible defects
-
5.7 Is the external container free from visible defects
-
5.8 Is the control panel 240 VAC isolator switch engaged with the turning bar to prevent unauthorised access to the panel when live
-
The above Post Commissioning Site Safety Inspection has been carried out by a member of the SHEQ Dept. and hereby submitted to the appropriate Department Line Manager for follow-up and closure of the corrective actions as detailed.
-
Inspector (Name and Signature)