Title Page

  • Site conducted

  • Select the template title

  • Client / Site

  • Conducted on

  • Inspected by

  • Position

  • Address

Information

  • Equipment

  • Voltage

  • Site Contact

  • Company

  • Tel No.

Section (A) On Site Access Safety

  • 1.0 Can the Edina Operations Engineer access the place of work safely

  • 1.1 Is there suitable access lighting

  • 1.2 Are the access routes in good condition

  • 1.3 Is there parking space available for an Edina Service vehicle

  • 1.4 Is there a procedure in place to allow an Edina Operations Engineer access to equipment outside of normal working hours

  • 1.5 Are all areas of the CHP / generator compound correctly fenced off

  • 1.6 Are there any trip hazards in the vicinity of the Container

  • 1.7 Are there any uneven ground conditions around the container

  • Conclusions & Recommendations

Section (B) On Site Container Access Safety

  • 1.8 Is the entrance height of the container safe

  • 1.9 Is the height of the concrete plinth safe

  • 2.0 Are the ground conditions around the container safe

  • 2.1 Can photographs or drawings be provided

  • Conclusions & Recommendations

Section (C) On Site Container High Access Safety

  • 2.2 Has the ladder been fitted with a ladder guard

  • 2.3 Has the ladder guard been fitted with a padlock and caution notice

  • 2.4 Is the ladder gate at the top operating correctly

  • 2.5 Has the ladder gate been fitted with an end stop

  • 2.6 Are all fixtures in good working order

  • 2.7 Is there a suitable guard rail system on top of the container

  • Conclusions & Recommendations

Section (D) On Site Mandatory Warning Notices & Emergency Contacts

  • 2.8 Is the standard Edina multiple hazard information sign displayed

  • 2.9 Is the regional Edina emergency contacts information displayed

  • 3.0 Are the emergency escape signs correctly placed

  • 3.1 Is there a muster point identified on site in the event of an emergency

  • Conclusions & Recommendations

Section (E) Pipeline & Cable Identification Marking

  • 3.2 Are the gas pipes correctly identified

  • 3.3 Is the direction of gas flow correctly identified

  • 3.4 Are lubricating oil pipelines indicated with brown labelling

  • 3.5 Are lubricating oil pipelines indicated with direction of flow

  • 3.6 Are air start pipes identified with blue labelling

  • 3.7 Are the water pipes correctly identified

  • 3.8 Are the water pipes indicated with direction of flow

  • 3.9 Are LV cables correctly identified

  • 4.0 Are the HV cables correctly identiifed

  • Conclusions & Recommendations

Section (F) Portable Appliance Testing & Asset Management Systems

  • 4.1 Are all portable 240 & 110 Volt tools & equipment PAT tested

  • 4.2 Are PAT tested items displaying an Asset ID number

  • 4.3 If an item has failed it's PAT test is it displaying a failed / Do Not Use / Quarantined label

  • 4.4 Are any on site ladders displaying a ladder TAG

  • 4.5 Are the lifting beams displaying the Safe Working Load

  • Conclusions & Recommendations

Section (G) Edina Documentation & Client Documentation / Procedures

  • 4.6 Is there a QR Code sticker on site

  • 4.7 Is there an Edina Log Book On Site

  • 4.8 Is there evidence of client site rules available

  • 4.9 Does the site conduct site specific inductions

  • 5.0 Are there areas on site that are separate from the standard induction i.e. High Voltage areas - If not click N/A

  • Conclusions & Recommendations

Section (H) Equipment Defects / Omissions

  • 5.1 Is the control room free from any visible defects

  • 5.2 Are the cable trays and cable harnesses free from any visible defects

  • 5.3 Is the alternator free from any visible defects

  • 5.4 Is the prime mover free from any visible defects

  • 5.5 Are the pipes and pumps free from visible defects

  • 5.6 Is the exhaust / silencer system free from visible defects

  • 5.7 Is the external container free from visible defects

  • 5.8 Is the control panel 240 VAC isolator switch engaged with the turning bar to prevent unauthorised access to the panel when live

  • The above Post Commissioning Site Safety Inspection has been carried out by a member of the SHEQ Dept. and hereby submitted to the appropriate Department Line Manager for follow-up and closure of the corrective actions as detailed.

  • Inspector (Name and Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.