Title Page

  • Clients Name & Lot Number

  • Conducted on

  • Prepared by

  • Location
  • Consent Number

  • Checked By

  • Please Sign

  • Weather Conditions

  • Site Conditions

  • Gib Fixers LBP Name & Licence Number

General

  • Are Consented Plans Sighted

  • All Previous Work Approved

  • Any Other SIte issues

  • Is Inspection For Correct Consent

  • Any Applicable Conditions /Advice Notes ?

Documentation

  • Penetration Schedule Available

  • PS4 Required From Penetration System Installer

  • As Built Plans Required

Postline

  • Ceilings

  • Walls

  • Brace / Tile Substrate Fixing

  • Sheet Material

  • Penetrations In Middle Third

  • Diaphragm Ceiling

  • Diaphragm Type

  • Please Insert Minimum Of Five Photos

Fire Rated Lining

  • Safe Or Protected Path

  • Sheet Material

  • Solid Blocking

  • FR Electrical Flush Boxes

  • Penetration Labels Installed

  • Smoke Separations

  • Sheet Fixing

  • Stopping

  • Penetrations Sealed

  • Smoke Sealing

  • Ceiling Cavity Checked

  • Quality Of Installation (Workmanship)

  • Work Carried Out As Per Plan Specifications

  • Specify Area Checked

  • Specify Items Checked

  • Notes:

  • Next Inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.