Information

  • Document No.

077 Monthly Fire Extinguisher Inspection

  • Conducted on

  • Prepared by

FIRE EXTINGUISHER INSPECTION INSTRUCTIONS Each fire extinguisher (Facility and Vehicle) needs to be inspected and signed off each month. The inspections should at a minimum include: o A visual inspection of the overall condition of the extinguisher and bracket. o Is the pressure gauge in the green? o Is the safety pull pin secured and in place? o Look at the discharge hose to be sure it is not pinched or damaged; be sure the end is not clogged, etc. o Is the monthly inspection tag attached and signed each month? o Is the annual inspection label attached? Is the annual inspection past due? o For wall mounted extinguishers there must be a clear path to the fire extinguisher- be sure there is nothing blocking access to the fire extinguisher, is there a sign on the wall identifying the extinguisher location? Is there a red box painted on the floor to show nothing should be stored in this area? o Any spare fire extinguishers should be stored in such a way as they are protected from falling over, and still need to be inspected monthly. o Any used or Out of Service fire extinguishers must be LOTO until they can be properly disposed of, and stored in a location where they will NOT be accessible in case of an emergency.

  • FIRE EXTINGUISHER<br>INSPECTION INSTRUCTIONS CON’T<br><br>Answering "S" for Satisfactory means you agree that you have performed the above required monthly inspection and initialed the monthly inspection tag. <br>If you answer "C" for Comment, please add a brief description of what the issue is and remove the fire extinguisher from service. Create a follow up action item to be sure the issue addressed, and replace the fire extinguisher with a spare. <br>Click YES to confirm you understand how to perform the Monthly Fire Extinguisher Inspection.<br>

FUEL TRUCKS

  • J-30-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-30-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-31-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-31-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-32-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-32-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-304-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-304-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-305-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-305-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-522-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-522-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-94-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-94-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-1242-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-1242-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-1243-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • J-1243-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A-15 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A-15 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A-43 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A-43 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A- 20 -Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A-20 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A- 202 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

  • A- 202 -Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX

WEST SIDE

HANGARS

  • Hangar A1/ West Wall-North, Fire Extinguisher #38, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A1/ West Wall-South, Fire Extinguisher #30, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A1/ East Wall-North Door Beam, Fire Extinguisher #H3, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A1/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due JuneFebruary, <br>Hydrostatic Test Due XXXX

  • Hangar A2/ West Wall-North, Fire Extinguisher #43, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A2/ West Wall-South, Fire Extinguisher #36, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A2/ East Wall-North Door Beam, Fire Extinguisher #41, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar A2/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar B/ West Wall-North, Fire Extinguisher #58, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar B/ East Wall-North Door Beam, Fire Extinguisher #57, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar B/ West Wall-South, Fire Extinguisher #H3, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar B/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar C/ West Wall-North, Fire Extinguisher #62, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar C/ East Wall-North Door Beam, Fire Extinguisher #61, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar C/ West Wall-South, Fire Extinguisher #63, <br>Annual Due June<br>Hydrostatic Test Due XXXX

  • Hangar C/ East Wall-South Door Beam, Fire Extinguisher #60, <br>Annual Due June<br>Hydrostatic Test Due XXXX

WEST: TERMINAL

  • Fire Ext. # 1, Supervisor Office,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 4, Lobby/ Pilot Lounge,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 6, Hallway to CBP<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 7, 2nd Floor HB,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 8, 2nd Floor Double Door,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 9, 2nd Floor/Stairs to 1st Floor Lobby,Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 12, 2nd Floor Hangar Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 14, 2nd Floor Hallway Machine 1,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 16, 2nd Floor Hallway A1/2 Stairs<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # YY, 2nd Floor Hallway HC Window,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 18, 2nd Floor Goldstar,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

WEST: FUEL FARM AND RAMP

  • Fence 1,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX

  • Fence 2,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX

  • Fence 3,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX

  • 125 lb Wheeled Unit/ FARM<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX

  • 125 lb Wheeled Unit/ RAMP<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX

NETJETS

Terminal

  • Dispatch Office,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

  • Hallway East End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

  • Hallway West End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

NJ Fuel Farm

  • Pole West End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

  • 125 lb. Wheeled Unit,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

  • Pole East End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX

EAST SIDE

EAST: HANGARS

  • Hangar #1 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #1 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #1 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #2 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #2 East Wall, Fire Extinguisher #2, , <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #2 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #3 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #3 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #3 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #4 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #4 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

  • Hangar #4 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX

EAST: TERMINAL

  • Fire Ext. # 3, Interior next to Ramp Door,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 4, Popcorn/Amenities Area,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 9 Line Shack,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 12 Outside next to Ramp Access,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 5 Cubicle North Wall<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 6 East Wall (Middle) Upstairs,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 7 South-East Wall Upstairs,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

  • Fire Ext. # 8 South-West Wall Upstairs<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX

FUEL FARM AND RAMP

  • North Wall<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

  • 125 lb. Wheeled Unit/ Farm<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

  • East Wall<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

  • 125 lb. Wheeled Unit/ Ramp<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

NORTH SIDE

NORTH: HANGAR VIP

  • Hangar VIP/ North Beam 1, Fire Extinguisher #1, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX

  • Hangar VIP/ North Beam 2, Fire Extinguisher #2, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX

  • Hangar VIP/ North Beam 3, Fire Extinguisher #3, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX

  • Hangar VIP/ South Beam 1, Fire Extinguisher #1,<br>Annual Due February, <br>Hydrostatic Test Due XXXX

  • Hangar VIP/ South Beam 2, Fire Extinguisher #2,<br>Annual Due June, <br>Hydrostatic Test Due JuneXXXX

  • Hangar VIP/ South Beam 2, Fire Extinguisher #2,<br>Annual Due June, <br>Hydrostatic Test Due June XXXX

NORTH: TERMINAL

  • Fire Ext. # 1, Line Shack Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 2 Interior Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX

  • Fire Ext. #3 Interior near Exit,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

  • Fire Ext. # 4 Orbic Hallway,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX

NORTH: FUEL FARM/RAMP

  • Fuel Farm 20 lb. BC, Fire Extinguisher #XX (Get Number), West Pole, <br>Annual Due in June, <br>Hydrostatic Due in june XXXX

  • Fuel Farm 20 lb. BC, Fire Extinguisher #XX (Get Number), East Pole, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX

  • Fuel Farm 125 lb. BC, Fire Extinguisher #XX (Get Number), Wheeled Unit, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX

  • Fuel Farm 125 lb. BC, Fire Extinguisher #XX (Get Number), Wheeled Unit, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.