Information
-
Document No.
077 Monthly Fire Extinguisher Inspection
-
Conducted on
-
Prepared by
FIRE EXTINGUISHER INSPECTION INSTRUCTIONS Each fire extinguisher (Facility and Vehicle) needs to be inspected and signed off each month. The inspections should at a minimum include: o A visual inspection of the overall condition of the extinguisher and bracket. o Is the pressure gauge in the green? o Is the safety pull pin secured and in place? o Look at the discharge hose to be sure it is not pinched or damaged; be sure the end is not clogged, etc. o Is the monthly inspection tag attached and signed each month? o Is the annual inspection label attached? Is the annual inspection past due? o For wall mounted extinguishers there must be a clear path to the fire extinguisher- be sure there is nothing blocking access to the fire extinguisher, is there a sign on the wall identifying the extinguisher location? Is there a red box painted on the floor to show nothing should be stored in this area? o Any spare fire extinguishers should be stored in such a way as they are protected from falling over, and still need to be inspected monthly. o Any used or Out of Service fire extinguishers must be LOTO until they can be properly disposed of, and stored in a location where they will NOT be accessible in case of an emergency.
-
FIRE EXTINGUISHER<br>INSPECTION INSTRUCTIONS CON’T<br><br>Answering "S" for Satisfactory means you agree that you have performed the above required monthly inspection and initialed the monthly inspection tag. <br>If you answer "C" for Comment, please add a brief description of what the issue is and remove the fire extinguisher from service. Create a follow up action item to be sure the issue addressed, and replace the fire extinguisher with a spare. <br>Click YES to confirm you understand how to perform the Monthly Fire Extinguisher Inspection.<br>
FUEL TRUCKS
-
-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-30-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-31-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-31-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-32-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-32-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-304-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-304-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-305-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-305-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-522-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-522-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-94-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-94-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-1242-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-1242-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-1243-Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
J-1243-Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A-15 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A-15 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A-43 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A-43 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A- 20 -Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A-20 Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A- 202 Left,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
-
A- 202 -Right,<br>Annual Due in February,<br>Hydrostatic Test Due Feb XXXX
WEST SIDE
HANGARS
-
Hangar A1/ West Wall-North, Fire Extinguisher #38, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A1/ West Wall-South, Fire Extinguisher #30, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A1/ East Wall-North Door Beam, Fire Extinguisher #H3, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A1/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due JuneFebruary, <br>Hydrostatic Test Due XXXX
-
Hangar A2/ West Wall-North, Fire Extinguisher #43, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A2/ West Wall-South, Fire Extinguisher #36, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A2/ East Wall-North Door Beam, Fire Extinguisher #41, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar A2/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar B/ West Wall-North, Fire Extinguisher #58, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar B/ East Wall-North Door Beam, Fire Extinguisher #57, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar B/ West Wall-South, Fire Extinguisher #H3, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar B/ East Wall-South Door Beam, Fire Extinguisher #H4, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar C/ West Wall-North, Fire Extinguisher #62, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar C/ East Wall-North Door Beam, Fire Extinguisher #61, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar C/ West Wall-South, Fire Extinguisher #63, <br>Annual Due June<br>Hydrostatic Test Due XXXX
-
Hangar C/ East Wall-South Door Beam, Fire Extinguisher #60, <br>Annual Due June<br>Hydrostatic Test Due XXXX
WEST: TERMINAL
-
Fire Ext. # 1, Supervisor Office,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 4, Lobby/ Pilot Lounge,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 6, Hallway to CBP<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 7, 2nd Floor HB,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 8, 2nd Floor Double Door,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 9, 2nd Floor/Stairs to 1st Floor Lobby,Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 12, 2nd Floor Hangar Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 14, 2nd Floor Hallway Machine 1,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 16, 2nd Floor Hallway A1/2 Stairs<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # YY, 2nd Floor Hallway HC Window,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 18, 2nd Floor Goldstar,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
WEST: FUEL FARM AND RAMP
-
Fence 1,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX
-
Fence 2,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX
-
Fence 3,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX
-
125 lb Wheeled Unit/ FARM<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX
-
125 lb Wheeled Unit/ RAMP<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX<br>Hydrostatic Test Due June XXXX
NETJETS
Terminal
-
Dispatch Office,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
-
Hallway East End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
-
Hallway West End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
NJ Fuel Farm
-
Pole West End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
-
125 lb. Wheeled Unit,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
-
Pole East End,<br>Annual Due in June, <br>Hydrostatic Test Due Feb XXXX
EAST SIDE
EAST: HANGARS
-
Hangar #1 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #1 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #1 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #2 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #2 East Wall, Fire Extinguisher #2, , <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #2 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #3 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #3 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #3 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #4 East Wall, Fire Extinguisher #2, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #4 North Wall, Fire Extinguisher #1, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
-
Hangar #4 South Wall, Fire Extinguisher #3, <br>Annual Due in June,<br>Hydrostatic Test Due XXXX
EAST: TERMINAL
-
Fire Ext. # 3, Interior next to Ramp Door,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 4, Popcorn/Amenities Area,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 9 Line Shack,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 12 Outside next to Ramp Access,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 5 Cubicle North Wall<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 6 East Wall (Middle) Upstairs,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 7 South-East Wall Upstairs,<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
-
Fire Ext. # 8 South-West Wall Upstairs<br>Annual Due in June,<br>Hydrostatic Test Due Feb XXXX
FUEL FARM AND RAMP
-
North Wall<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
-
125 lb. Wheeled Unit/ Farm<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
-
East Wall<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
-
125 lb. Wheeled Unit/ Ramp<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
NORTH SIDE
NORTH: HANGAR VIP
-
Hangar VIP/ North Beam 1, Fire Extinguisher #1, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX
-
Hangar VIP/ North Beam 2, Fire Extinguisher #2, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX
-
Hangar VIP/ North Beam 3, Fire Extinguisher #3, <br>Annual Due June, <br>Hydrostatic Test Due June XXXX
-
Hangar VIP/ South Beam 1, Fire Extinguisher #1,<br>Annual Due February, <br>Hydrostatic Test Due XXXX
-
Hangar VIP/ South Beam 2, Fire Extinguisher #2,<br>Annual Due June, <br>Hydrostatic Test Due JuneXXXX
-
Hangar VIP/ South Beam 2, Fire Extinguisher #2,<br>Annual Due June, <br>Hydrostatic Test Due June XXXX
NORTH: TERMINAL
-
-
Fire Ext. # 1, Line Shack Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 2 Interior Hallway,<br>Annual Due in June, <br>Hydrostatic Test Due June XXXX
-
Fire Ext. #3 Interior near Exit,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
-
Fire Ext. # 4 Orbic Hallway,<br>Annual Due in June,<br>Hydrostatic Test Due June XXXX
NORTH: FUEL FARM/RAMP
-
Fuel Farm 20 lb. BC, Fire Extinguisher #XX (Get Number), West Pole, <br>Annual Due in June, <br>Hydrostatic Due in june XXXX
-
Fuel Farm 20 lb. BC, Fire Extinguisher #XX (Get Number), East Pole, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX
-
Fuel Farm 125 lb. BC, Fire Extinguisher #XX (Get Number), Wheeled Unit, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX
-
Fuel Farm 125 lb. BC, Fire Extinguisher #XX (Get Number), Wheeled Unit, <br>Annual Due in June, <br>Hydrostatic Due in June XXXX