Title Page
-
IQA Date
-
IQA Assessor
-
Student
-
Assessor
-
For 5357-23/94 has at least 1 job been done on a non domestic property?
-
Has this unit been fully sampled?
IQA Assessor Checklist
Have electrical faults been identified? (Assess minimum of three from the following)
-
Has a minimum of 3 faults been identified?
-
Which 3
- Loss of supply
- Overload
- Component,accessory or equipment faults
- Transient voltage
- Loss of phase/line
- Incorrect phase rotation
- High resistance joints
- Short-circuit and earth fault
- Open circuit
- Signal fault
Have suitable diagnostic tests been performed, using the following instruments correctly? (Assess minimum of three from the following
-
Has a minimum of 3 different test equipment been used?
-
Which 3
- Voltage indicator
- Low-resistance ohmmeter
- Insulation resistance testers
- EFLI and PFC tester
- RCD tester
- Tong tester/clamp-on ammeter
- Phase sequence tester
- Other appropriate
-
Please State
Completed test certification.
-
Has a test certificate been completed for both jobs?
-
Job 1 Test Certification
-
Job 2 Test Certification
Assessor Feedback and Planning
-
Has assessor feedback and planning been given to the learner.
Expert Witness
-
Has the evidence been signed off by an expert witness?
-
Expert Witness Name
IQA Feedback and Sign Off
Feedback To The Assessor
-
Feedback for the Assessor
IQA Signature
-
I have sampled this evidence as part of my verification sample.