Information

  • 1A BASEMENT PLANTROOM - DAILY CHECK

  • Location
  • Conducted on

  • Campus

  • Completed by

  • Document No.

Previous Audit

  • Have the actions of the previous audit been actioned?

1A Basement Plantroom

  • Clean and Safe

  • Lighting Operational

  • Emergency Exit Lights Operational

  • Abnormal Noise

  • Plant Room Secure

Multi-stack chiller number 1 (CH-B-1)

  • Chiller Operational

  • Chiller Online

Condenser water pump (CCWP-B-1)

  • Running?

  • Suction pressure within acceptable range

  • Discharge pressure within acceptable range

  • Cond water flow temp within acceptable range

  • Cond water return temp within acceptable range

Chilled water pump (CHWP-B-1)

  • Running?

  • Suction pressure within acceptable range

  • Discharge pressure within acceptable range

  • Chilled water flow temp within acceptable range

  • Chilled water return temp within acceptable range

  • Evaporator temp within acceptable range

Multi-stack chiller number 2 (CH-B-2)

  • Chiller Operational

  • Chiller Online

Condenser water pump (CCWP-B-2)

  • Running?

  • Suction pressure within acceptable range

  • Discharge pressure within acceptable range

  • Cond water flow temp within acceptable range

  • Cond water return temp within acceptable range

Chilled water pump (CHWP-B-2)

  • Running?

  • Suction pressure within acceptable range

  • Discharge pressure within acceptable range

  • Chilled water flow temp within acceptable range

  • Chilled water return temp within acceptable range

  • Evaporator refrigerant temp within acceptable range

Mechanical Services Board (MSB-B1)

  • Lamp Test

  • Faults

Sec. Cond. Water Pumps (SCCWP-B-1 and SCCWP-B-2)

Pump Operational (which pump?)

  • Suction pressure within acceptable range

  • Discharge pressure within acceptable range

Heat Exchanger

  • HEX Operational

  • Steam pressure within acceptable range

  • HHW pump running? (Either HHWP-B-1 or HHWP-B-2)

  • HHW flow temp within acceptable range

Steam Header

  • Free from leaks/abnormal noise

Plant/piping in plant room free from leaks/abnormal noise?

Air Handling Units

AHU-B-1, B-2 and B-3

  • Belts & Pulleys Operational

  • Vibration Normal

  • Valves & Actuators Operational

  • Safety guards secure

  • Clean & Safe

  • Lighting Operational

  • Filters installed and operational

  • Units free of leaks (provide details of any leaks)

Mechanical Services/Distribution Boards MSB B2, MSB B3 and MDB-B4

  • Lamp Test

  • Free from faults

Items for follow up or requiring action? Please write details.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.