Title Page
-
Project
-
Loop ID
Scouting (looping)
-
Size of loop (kilometres)
-
Hazards (please describe)
-
How many easy access points along the loop (spool drop off points)
-
What is resistance of loop?
-
Number of trail/road crossings
-
Amount of vegetation on loop?
-
Water crossings
-
How many open weak links required? (links that are reconnected/disconnected daily)
-
How many closed weak links required? (links that are NOT reconnected/disconnected daily and/or buried)
-
How many wire crossing signs required?
-
Wire proximity to public