Information
-
1B LEVEL 4 PLANTROOM - DAILY CHECK
-
Location
-
Conducted on
-
Campus
-
-
Completed by:
-
-
Document No.
Previous Audit
-
Have the actions of the previous audit been actioned?
1B Level 4 Plantroom
-
Clean & Safe
-
Lighting Operational
-
Emergency Exit Lights Operational
-
Free of Abnormal Noise
-
Plant Room Secure
Air Handling Units
AHU 4-1 to 4-17
-
Belts & Pulleys Operational
-
Vibration Normal
-
Valves & Actuators Operational
-
Safety guards secure
-
Clean & Safe
-
Lighting Operational
-
Filters installed and operational
Air Receivers/Air Compressors
-
Air receiver 1 pressure within acceptable range
-
Air receiver 2 pressure within acceptable range
-
New Atlas Copco air compressor 1 operating appropriately
-
New Atlas Copco air compressor 2 operating appropriately
-
Open manuals drains to drain water
-
Due for service?
-
Free of leaks at piping/connections/plant
Vacuum Pumps
-
Online
-
Operational
-
Lead Pump
-
Run hours of each pump approximately equal
Mechanical Distribution Board
-
Lamp Test
-
Faults
Tunnel Washer Air Compressors
-
Online
-
Operational
-
Due for service?
-
Free of leaks at piping/connections/plant
Items for follow up or requiring action? Please write details.
-
Add signature