Information

  • 1B LEVEL 4 PLANTROOM - DAILY CHECK

  • Location
  • Conducted on

  • Campus

  • Completed by:

  • Document No.

Previous Audit

  • Have the actions of the previous audit been actioned?

1B Level 4 Plantroom

  • Clean & Safe

  • Lighting Operational

  • Emergency Exit Lights Operational

  • Free of Abnormal Noise

  • Plant Room Secure

Air Handling Units

AHU 4-1 to 4-17

  • Belts & Pulleys Operational

  • Vibration Normal

  • Valves & Actuators Operational

  • Safety guards secure

  • Clean & Safe

  • Lighting Operational

  • Filters installed and operational

Air Receivers/Air Compressors

  • Air receiver 1 pressure within acceptable range

  • Air receiver 2 pressure within acceptable range

  • New Atlas Copco air compressor 1 operating appropriately

  • New Atlas Copco air compressor 2 operating appropriately

  • Open manuals drains to drain water

  • Due for service?

  • Free of leaks at piping/connections/plant

Vacuum Pumps

  • Online

  • Operational

  • Lead Pump

  • Run hours of each pump approximately equal

Mechanical Distribution Board

  • Lamp Test

  • Faults

Tunnel Washer Air Compressors

  • Online

  • Operational

  • Due for service?

  • Free of leaks at piping/connections/plant

Items for follow up or requiring action? Please write details.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.