Title Page
-
Grovelands
Flat no
-
undefined
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
-
Block
-
Level
- Basement
- Ground floor
- 1st floor
- 2nd floor
- 3rd floor
- Roof
-
Conducted on
-
Prepared by
-
Location
1st fix sign off
-
Have pattresses been installed for light pendants (marked up by electrician)
-
Have pattresses been installed for TV mounts (marked p by electrician)
-
Have mid span noggins been installed at correct height and straight
-
Have walls been installed plumb and straight
-
Have walls been installed to correct dims
-
Are the fixings being used fit for purpose and at correct centres as agreed
-
Are there sufficient pickups for plaster board to perimeter at ceiling level
-
Has the unit been left clean and tidy