Plot Details

  • Conducted on

  • Builder

  • Site

  • Plot Number

  • Prepared by

  • Location

Checklist

  • Access into plot clear and safe.

  • Joists drilled at correct centres.

  • Dwangs fitted to correct distance.

  • Soils/Wastes taped/clipped.

  • Dwangs & Gyproc installed to allow SVP to be clipped.

  • DPC on soils/wastes where pass through joists.

  • Pipework clipped & straight.

  • Towel rail pipework roughed.

  • Pipework insulated (where applicable).

  • Pressure test carried out.

  • Crossover pipes fitted with protection.

  • Safety discharge pipe fitted.

  • Foil tape fitted (where applicable).

  • ID tape to all pipework.

  • Client extras checked.

  • Main stopcock/DCV fitted.

  • Metal plates fitted (where applicable).

  • Holes drilled through kit for Flue/Discharge/Gas etc.

  • Gas pipe sleeves through wall.

  • SVP terminal connected to vent terminal.

  • Plot tidied out.

  • Additional information.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.