Plot Details
-
Conducted on
-
Builder
-
Site
-
Plot Number
-
Prepared by
-
Location
Checklist
-
Access into plot clear and safe.
-
Joists drilled at correct centres.
-
Dwangs fitted to correct distance.
-
Soils/Wastes taped/clipped.
-
Dwangs & Gyproc installed to allow SVP to be clipped.
-
DPC on soils/wastes where pass through joists.
-
Pipework clipped & straight.
-
Towel rail pipework roughed.
-
Pipework insulated (where applicable).
-
Pressure test carried out.
-
Crossover pipes fitted with protection.
-
Safety discharge pipe fitted.
-
Foil tape fitted (where applicable).
-
ID tape to all pipework.
-
Client extras checked.
-
Main stopcock/DCV fitted.
-
Metal plates fitted (where applicable).
-
Holes drilled through kit for Flue/Discharge/Gas etc.
-
Gas pipe sleeves through wall.
-
SVP terminal connected to vent terminal.
-
Plot tidied out.
-
Additional information.