Information

  • Client / Site

  • Project Job no.

  • Site address
  • Operations Manager

  • Project Manager

  • Quantity Surveyor

  • H&S

  • Site Manager

  • Start on site date

  • Handover date

  • Project duration (weeks)

Part A - 1st fix status queries

  • Are CCTV and Security Contractors required?

  • Is electrical containment in place?

  • When will this be completed?

  • Need to know where the kit is being located? (i.e. in a rack)

  • Have drawings been issued to electrical contractor for containment

  • When will this be completed?

  • Access hatches required?

  • How many do you require and locations?

  • Walk-in Fridge / Catering required?

  • Have power requirements issued to electrical contractor?

  • When will they be?

  • Condenser locations agreed?

  • When will they be agreed?

  • Openings/Walls in place ready

  • By when?

  • Is floor finish in place? (if required prior)

  • When will this be in place?

  • Ready for fridge contractor site attendance to measure?

  • When will this be ready?

  • Any access hatches required?

  • How many and sizes / locations?

  • Shop Front install?

  • Are stall risers complete ready for shop front contractor to attend to take manufacture dimensions?

  • When will they be ready?

  • Signage and Artwork install

  • Position and quantity of access hatches been agreed with Thompsons?

  • What is required?

  • Power requirements agreed with electrical contractor?

  • When can they be supplied?

  • Is power in place ready?

  • When will this be done?

  • Is external fascia ready for signage to be installed?

  • When will this be completed?

  • Is any wall signage/artwork locations been agreed with design team and electrical contractors?

  • When will this be agreed?

  • Is all artwork been checked that is being provided to ensure correct to latest drawings?

  • When can this be checked?

  • Is any other works proposed in areas that may cause delay to signage install?

  • What items

  • BT Openreach / WIFI required?

  • Is comms room/cabinet ready

  • When will it be ready?

  • Is power requirements to cab in place?

  • When will this be ready?

  • Mechanical

  • Are all knock off positions agreed?

  • When will they be agreed?

  • Control panel / fan control positions agreed?

  • When will this be agreed?

  • Canopy requirements / duct clean positions agreed?

  • When will they be agreed?

  • Have all BWIC items been discussed with Thompsons - incl. core holes and fire stopping

  • When can information be supplied?

  • Access hatch quantity/size and locations all confirmed

  • What is required?

  • Electrical

  • Is there an electrical supply present that is suitable for proposed use?

  • What is required?

  • Has a site survey been carried out?

  • When will this be done?

  • Has clash management of containment and ductwork been carried out with mechanical contractors

  • When can this be done?

  • Has all lighting been ordered?

  • When will this be ordered?

  • Will this be on site as programme?

  • When will this land?

  • Will this be on site as programme?

  • Have catering drawings / loading schedule been supplied?

  • When will this be supplied?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.