1.00 Concrete Inspection
-
1.01 Select Concreter that completed the job.
- Guncrete
- AMT Concrete
- Total Concrete
- Neetcreete (Sth)
- Western Star (Sth)
- Vortex (Sth)
- Frank Illiano (Nth)
- Michael VAS (Nth)
- Gary Easton (Nth)
- Gordo (Nth)
- Scott Worsley (Nth)
- Ian Jeffries (Nth)
- Other
-
Please note details of Other?
-
1.02 Is Site Fencing intact? (no gaps or damage)
-
1.03 Is all rubbish in the designated area?
-
If No, notify contractor ASAP & advise HSEQ Systems Manager to investigate, take photographs if applicable
-
1.04 Has all fill been removed?
-
1.05 Is job completed to standard with no evidence of exposed steel?
-
Please photograph and advise engineer and concreter
-
1.06 Has excess concrete been spread and hosed appropriately?
-
Payment not to be approved until all excess concrete is removed or spread appropriately. No spillage is to be left to the side and rear boundary.
-
1.07 Is sediment control in place and is road free of sediment?
-
If No, notify contractor ASAP & advise HSEQ Systems Manager to investigate, take photographs if applicable
-
1.08 Is there a drop edge beam on this job? (Answer N/A for No drop edge)
-
1.08.1Has drop edge beam finished to required standard?
-
Contact Concreter to rectify
-
108.2 Measure total square metres of drop edge beams
-
1.09 Is Slab finished to required standard? (note any undulations)
-
Take photographs and spray mark any inconsistencies
-
1.10 Is Terrazzo and patio finished to required standard?
-
1.11 Are rebates finished appropriately to standard? (check level and consistency)
-
Photograph as required
-
1.12 In your opinion has work been completed to standard?
-
Please explain in details of reasons you believe it is not to standard
-
1.13 Can this Job be paid?
-
Email this report to contractor to rectify any outstanding items prior to payment approval.
COMMENTS
-
Note any further comments
Sign off
-
Concrete Supervisor sign off