Information

  • Job No.

  • Address

  • Conducted on

  • Prepared by

PRE TILING CHECKLIST

  • 1.01 Is front patio square around piers?

  • 1.02 Has all rubbish been removed around patios and Alfresco as to fit risers?

  • 1.03 Has Granitgard been install to the following areas: (please tick)

  • Front Door

  • Terrazzo

  • Laundry Door

  • External Garage

  • 1.04 Have all architraves and door jambs been installed?

  • 1.05 Have all shower and door angles been install square and level?

  • 1.06 Are bath cutouts correct for bath size?

  • 1.07 Are bath taps correct and centred over bath?

  • 1.08 Are all niches are square and level?

  • 1.09 Are all shower floors dished towards waste? (not humped)

  • 1.10 Has waterproofer levelled PVC Pipe to slab?

  • 1.11 Are all vanities installed?

  • 1.12 Is Laundry Tub on site?

  • 1.13 Is main floor free of slumps or undulations?

  • Contact Concreter, this must be rectified prior to second state tiling

  • 1.14 Are Sliding Door Thresholds and supports free of any issues?

SIGN OFF

  • I certify information that is contained within this report is true and correct

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.