Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Those present at Meeting
-
Enter Details of all Persons Present at Meeting
Architects Report and Site Specific Reminders
-
Has Architect rebriefed project, highlighting any changes from original briefing meeting?
-
Is it a Leasehold or Freehold property?
-
Is it a Listed Building?
-
Is it within a Conservation Area?
-
Has Planning Permission been achieved?
-
Have all planning conditions been discharged?
-
Has Listed Building Consent been achieved?
-
Are there any planning restrictions, hours, noise etc?
-
Has Licensing been achieved?
-
Has a pavement licence been applied for?
-
Has landlord permission been achieved?
-
Has a license to alter been received?
-
Has signage scheme been formally approved, and issued to all parties?
-
Any development shell issues?
-
Confirm Rights of Ways as applicable?
-
Does anyone have any access rights over our demise?
-
Are party wall awards applicable and if applicable have they been agreed?
-
Are timber or damp specialist reports required?
-
Have full sets of all drawings been issued to all members of the development team?
-
Has a finishing schedule been issued to clarify all details?
-
Has the green PCF been signed?
-
Detail revision/ option number
-
Has a cost tracking document been prepared and ready for issue on week one of contract?
-
Have site access arrangements been agreed with Main Contractor?
-
Has Architect confirmed the design team responsible for the project with contact details for all parties?
-
Have promotional boards for new development been arranged for nearest JDW sites?
-
Have operations team been sent the briefing pack?
-
Has formal JDW operations team feedback been received on AWP positions?
-
Has the day and dates of progress meetings been agreed with development team?
-
Have JDW given formal approval of project dates and agreed with Letter Of Approval or Email?
-
Have valuation of works procedures been agreed?
-
Has Client Direct list or orders and descriptions been issued to Main Contractor?
-
Are there any outstanding Client Direct orders or items?
-
Is there a Global Fire Fighting equipment design issued?
-
Has the staff facilities layout been approved at the Design meeting?
-
Has the Development information to ops been prepared including DHL plan?
-
Has Biffa been contacted to arrange a site survey?
Main Contractor
-
Has program been issued to all parties?
-
Do all parties agree that the program is realistic and achievable?
-
Has a Information Required List been issued, and a date for answers agreed upon with all parties?
-
Has location of site office and welfare facilities been agreed?
-
Have arrangements been agreed for site access / security, and signing in and out procedures?
-
Has there been confirmation of PPE requirements for the site?
-
Have working hours been discussed and agreed upon?
-
Have any delivery restrictions been discussed and agreed upon?
-
Have pavement licence, skip license, highway blockage etc been applied for?
-
Have Site Agents and Contract Managers details been circulated to all?
-
Has Building Inspector been notified of start on site dates?
-
Are there any materials chosen that cause concern due to suitability or availability ?
-
AOB - Main Contractor
Contract Documents
-
Has Work Instruction been signed by Property Development Manager and Main Contractor?
-
Have project preliminaries been attached to the Works Instruction?
-
Has Mechanical Collateral Warrenty been signed by Property Development Manager, Mechanical Contractor and Main Contractor?
-
Has Electrical Collateral Warrenty been signed by Property Development Manager, Electrical Contractor and Main Contractor?
-
Have Work Instruction, Project Preliminaries, Mechanical Collateral Warranty and Electrical Collateral Warranty been emailed to JDW head office?
CDM Co-Ordinator
-
Have we got an agreed customer occupancy figure that both architect and CDM-C agree with?
-
Has F10 been signed and issued?
-
Has Construction Phase Health and Safety plan been approved?
-
Has asbestos survey been carried out and all asbestos removed from site?
-
Has a clean air certificate been issued if applicable?
-
Has a Permit to Proceed been issued?
-
Are there any work items that present unusual risks?
-
Are all Risk Assessments and Method Statements on file adequate and accurately describe the works to be undertaken?
Structural Engineer
-
Does the Structural Engineer have any concerns of existing building condition?
-
Have all necessary structural drawings been issued?
-
Has a time for all opening up / demolition works been agreed for checking?
Mechanical Contractor
-
Has all redundant pipe work and ducting been identified for strip out?
-
Have contract drawings been issued, and match Architects layouts?
-
Have upgrades to Water and Gas been carried out, or at least programmed in within contract period?
-
Have access requirements to plant equipment been identified and discussed?
-
Will customer staircase / corridor areas be adequately heated?
-
BWIC to be marked up and issued to Main Contractor in week 2
-
Is plant in the position agreed at Briefing meeting?
-
AOB - Mechanical Contractor
Electrical Contractor
-
Have all redundant cables been identified for strip out?
-
Has upgrade to Electrics been carried out, or at least programmed in within contract period?
-
Have lighting layout drawings been recieved?
-
Are light fittings style and weights fully understood?
-
Has delivery date for lights been agreed, and a safe place identified on site for storage?
-
Do all external doors have over door heaters?
-
Does staff area, office and back of house corridors have adequate panel heaters?
-
Will all external lights be on Dusk until Dawn sensors?
-
Are all lamps to be LED supplied from Mico?
-
AOB - Electrical Contractor
Kitchen Contractors Report
-
Will all existing kitchen equipment be stripped out on a date agreed?
-
Are any pieces of equipment salvageable for re-use?
-
Has a DAG approved kitchen layout been issued?
-
Plan number
-
Has a DAG approved Wash Up area drawing been issued?
-
Has a delivery date for kitchen equipment to site been agreed?
Innserve
-
Will all existing cellar equipment be stripped out on a date agreed?
-
Are any pieces of equipment salvageable for re-use?
-
Has a cellar layout drawing been issued?
-
Is the Free Air system incorporated into design?
-
Are Innserve happy with the location of the condensers and that they will work as designed with no issues?
Secom
-
Has second site visit highlighted any additional security risks that need consideration?
-
Will site have full CCTV coverage within trade area?
-
Will external areas have full CCTV coverage?
-
Has smoke screen position been agreed?
-
Is lighting layout understood and confirmed as not conflicting with camera layout?
-
Is there any developments in technology we should consider to improve this sites security?
-
Confirm that the fire alarm will be connected to the alarm signalling line?
Lift Engineer
-
Does the property have any existing lift equipment that can be used?
-
Has a position for lift shaft and pit been agreed?
-
Does the lift shaft or pit have any special requirements?
-
Are first and second fix dates agreed with the Main Contractor?
Development Programme Dates Agreed
-
Start on Site
-
Builders Completion
-
Handover
-
PO1
-
PO2
-
6 Months Defect Meeting
Sign Off
-
Is Architect happy to start project and deliver it on time and within budget?
-
Is Main Contractor happy to start project and deliver it on time and within original contract sums?
-
Is Mechanical Contractor happy to start project and deliver it on time and within original contract sums?
-
Is Electrical Contractor happy to start project and deliver it on time and within original contract sums?
-
Is PDM happy to start project and confident there is enough information to complete the project on time / budget?