Title Page
-
Site Address:
-
Project Reference :
-
Date of Inspection:
-
Contract:
-
Inspected by:
-
Team Leader:
-
Mate(s):
-
Mate(s):
-
Mate(s):
General Site Audit <br>
-
Brief Description of Work:
Signing, Lighting and Guarding
-
1. Are advance warning signs set out and sandbagged? E.g. MAW, Road Narrows, Footway Closed Etc.
-
2. Are permit boards displayed, sandbagged and with the correct permit number for each street? <br>
-
3. Are lead in and exit tapers set out correctly with double blue arrows where required? <br>
-
4. Is the route for pedestrians clear and safe? EG. Footway Closed Signs, Walkways, Drop Kerbs, Minimum Width Maintained <br>
-
5. Are all footway/driveway boards safe and secure? <br>
-
6. Where required is the safety zone set out correctly and minimum road width maintained? <br>
Services
-
Has the gas meter been disconnected as per procedures? <br>
-
Has the appropriate method of service installation/renewal/isolation been selected? <br>
-
Has the pressure testing and commissioning of services carried out correctly? <br>
-
Has the correct labeling been identified and applied to the service as per Cadent procedures? <br>
-
Have external valves and suitable surface covers been installed where required? <br>
-
Is the emergency control valve the correct type and fitted as per procedures? <br>
-
Has the wall sleeve sealed and wall clip been correctly fitted? <br>
-
Has a suitable meter box been selected positioned and fitted correctly? <br>
-
Are moling activities being carried out in accordance with procedures? <br>
-
Does the installation comply with minimum depth of cover requirements? <br>
-
Is the service installed as per Cadent procedures? <br>
Vehicles
-
Has a vehicle walk around check been completed and recorded?
Site Inspection Form
- SUMMARY
-
Additional Comments:
-
Corrective Actions:
Audit Review - PM / HSEQ
-
Has this Audit been Audited by the Relevant Project Manager or HSEQ team?
Sign-off
-
Inspection Completed By:
-
Team Leader Signed: