Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Region
-
Contractor/s
-
Audit Date
-
Time
-
LIS No.
-
Address
-
Service Order No.
-
Date of works completed in the field.
-
What stage of the works
1. Re Instatements
-
Has footpath been adequately reinstated?
-
Has this address been logged in a re-instatement register?
-
Has road been adequately reinstated?
-
Has nature strip been adequately reinstated?
2. Depth
-
Has the UG been installed at the appropiate deopth of 600mm
-
Has the standard covers been installed?
-
Have Cover gauards been installed to the correct height on the pole?
3. Labels
-
Is an approved UE warning label attaced to the cover gaurds?
-
Has the FOLCB been marked with the installation address?
-
Are all labels visible on the pole. (Are the guards covering any labels).
4. Pit
-
Is the top of the Pit level with the ground?
-
Has the cable in the pit been capped?
-
Has the cable in the pit been terminated with approced IPC's?
-
Does the N in the pit have a N Tag?
-
Is the pit located on the boundary?
9. SAP Claims
-
Does the SAP claim match the works conducted on site?
-
Does the service provider claims match the claims in UE sap?
-
Comments
-
Overall Audit Rating
- 1
- 1.5
- 2
- 2.5
- 3
- 3.5
- 4
- 4.5
- 5
- 5.5
- 6
- 6.5
- 7
- 7.5
- 8
- 8.5
- 9
- 9.5
- 10