Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Region

  • Contractor/s

  • Audit Date

  • Time

  • LIS No.

  • Address

  • Service Order No.

  • Date of works completed in the field.

  • What stage of the works

1. Re Instatements

  • Has footpath been adequately reinstated?

  • Has this address been logged in a re-instatement register?

  • Has road been adequately reinstated?

  • Has nature strip been adequately reinstated?

2. Depth

  • Has the UG been installed at the appropiate deopth of 600mm

  • Has the standard covers been installed?

  • Have Cover gauards been installed to the correct height on the pole?

3. Labels

  • Is an approved UE warning label attaced to the cover gaurds?

  • Has the FOLCB been marked with the installation address?

  • Are all labels visible on the pole. (Are the guards covering any labels).

4. Pit

  • Is the top of the Pit level with the ground?

  • Has the cable in the pit been capped?

  • Has the cable in the pit been terminated with approced IPC's?

  • Does the N in the pit have a N Tag?

  • Is the pit located on the boundary?

9. SAP Claims

  • Does the SAP claim match the works conducted on site?

  • Does the service provider claims match the claims in UE sap?

  • Comments

  • Overall Audit Rating

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.