Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Client
-
Region
-
Contractor/s
-
Job Description
-
Stage of Works Audited
- Dressed up and Coiled by Civils
- Dressed up by SP within 5 business days of completed civil installation
-
Service Order Number
-
Date
-
Time
1. Reinstatement status
-
Has footpath been adequately reinstated?
-
Has this address been logged in a reinstatement register?
-
Has the road been adequately reinstated?
-
Has the nature strip been adequately reinstated?
-
Has the Cable Route plan been uploaded into EDMS?
-
Does the cable route plan in EDMS match the physical works completed?
-
Does Completed Drawing number comply with current UE Distribution Network Assets Drafting format?<br>
-
Does the U/G Supply Point come from a UE Mains Supply Pole. (Not from a service Pole or a Public Lighting Pole).
2. Depth
-
Has the underground conduit been installed at the appropriate depth of 600mm?
-
Have the appropriate cover guards been installed?
-
Have the appropriate cover guards been installed to the correct height of 2400mm Min from ground level.
-
Have the appropriate cover guards been installed to the correct depth of Approx 100mm Min below ground level.
-
Have underground cover slabs been installed over conduit at pole base?
-
Other.
3. Labels
-
Has an approved UE Cable Warning Sign been installed? (Not Required if Guards are embossed with the word ELECTRICITY).
-
Are the cover guards approriately attached?
-
How have Cover guards been attached?
-
Has the FOLCB been installed?
-
Has the FOLCB been marked with the installation address?
-
Are all labels etc visible on the pole? (Are the guards covering any labels?)
4. Pit
-
Is the top of the Pit level with the ground?
-
If No IPC's installed - has the cable in the pit been capped?
-
Has the cable in the pit been terminated with the approved IPC's?
-
Does the Neutral cable in the pit have an 'N' Tag?
-
Is the pit located on the property boundary?
-
Other.
5. SAP Claims Met
-
Does the service provider claim match the claim in UE SAP?
-
Installation Completed Date
-
Comments
-
Overall Audit Rating
- 1
- 1.5
- 2
- 2.5
- 3
- 3.5
- 4
- 4.5
- 5
- 5.5
- 6
- 6.5
- 7
- 7.5
- 8
- 8.5
- 9
- 9.5
- 10