Title Page
-
Conducted on
-
Prepared by
-
Location
-
On site weather conditions
- FAIR
- RAIN
- HOT
- WINDY
- NIGHT
-
Has everyone on site completed prestart?
-
Add drawing
-
Has everyone on site signed SWMS?
-
Add drawing
-
Do all workers have correct PPE for the days works?
-
Add drawing
-
Are all tools and Equipment in safe and clean condition?
-
Add drawing
-
Has plant prestart been completed?
-
Add drawing
-
Has traffic management been deployed / started
DAY CIVIL WORKS
-
Boring and Trenching across roads, completed as per Vic roads standard section 700 and IFC drawings
-
PHOTOS
-
Pits installed as per standard Vic roads drawing TC-1230 and IFC drawings
-
PHOTOS
-
Pit locations (corner or nearest pole number)
-
Controller / Butlers foundation installed as per standard Vic road drawing TC-1203
-
PHOTO
-
2B footings installed as per standard Vic roads drawing TC-1200 and IFC drawings
-
PHOTOS
-
Foundation Locations (pole number)
-
3 meter footings installed as per standard Vic roads drawing TC-1201
-
PHOTOS (inc dockets, holes, test reports)
-
Foundation Locations (pole number)
-
Site clean and free of debris and rubbish
-
Why?
-
After care installed, all footpaths, roadways and crossovers reinstated and safe
-
Why?
-
Dressed with top soil
-
PHOTO
-
final reinstatement
-
PHOTO
-
Any site defects, or outstanding works
-
PHOTO
-
description of works required
-
I hereby certify that all Civil works have been completed to the appropriate standards / specifications and Drawings