Title Page

  • Mains trade test

  • ENWL training academy

  • Conducted on

  • John lee

  • Personnel

Jointing

  • SNE cut-out

Joint 1

  • Service breech joint 35mm CNE off 3c 120 Pilc

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Through cable tested correctly?

  • Overall strip correct?

  • Testing across live connections done correctly

  • Does the joint fit in the shell

Joint 2

  • 3c waveform breech joint off Consac

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Through cable tested correctly?

  • Overall strip correct?

  • Testing across live connections done correctly

  • Does the joint fit in the shell

Joint 2

  • Waveform breech joint off waveform

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Through cable tested correctly?

  • Overall strip correct?

  • Testing across live connections done correctly

  • Does the joint fit in the shell

Joint 3

  • Waveform bottle end

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Overall strip correct?

  • Does the joint fit in the shell

Joint 4

  • Waveform live cut and straight joint

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Through cable tested correctly?

  • Overall strip correct?

  • Testing across live connections done correctly

  • Does the joint fit in the shell

Joint 5

  • SNE service breech joint

  • Correct PPE worn throughout?

  • Correct procedures followed?

  • Through cable tested correctly?

  • Overall strip correct?

  • Testing across live connections done correctly

  • Does the joint fit in the shell

Service position tests

Polarity and ELI testing

  • CNE cut-out correct polarity found?

  • CNE cut-out no neutral found?

  • CNE cut-out cross polarity found?

  • CNE cut-out dead found?

  • SNE cut-out correct polarity found?

  • SNE cut-out cross polarity found?

  • SNE cut-out No neutral found?

  • SNE cut-out DEAD found?

  • Correct ELI reading for CNE cut-out identified (max reading 0.35 Ohms)?

  • Correct ELI reading for SNE cut-out identified (max reading 0.80 Ohms)?

Insulation resistance and continuity

Insulation resistance and continuity testing on 3c 25mm CNE

  • Did they find short between 2 phases?

  • Did they find the cable healthy?

  • Did they find broken phase?

Insulation resistance and continuity testing 3 x single phase 35mm CNE cables

  • Were the 2 healthy cables found?

  • Was the cable with the dead short found?

Phasing out between 2 cables

  • Did the find cables with correct phasing-colour to colour?

  • Did the find phase to phase crosses between the two cables?

  • Did they find phase and neutral cross between the two cables?

Fault finding on 4c waveform

Testing on 4c mains cable

  • Phase down found?

  • Healthy cable found?

  • No neutral found?

  • No earth found?

  • Phase and neutral cross found?

  • Cable dead found?

  • Phase to phase (weld) found?

Signatures

Course review

  • Assessor name

  • Assessor name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.