Title Page

  • COMPLETED ON

  • TOW NUMBER

  • NODE SITE ID

  • Location

Electrical Report

  • Start time leave base.

  • Start Location

  • Supply photo to confirm location and date/time

  • Arrival Time at site Supply photo to confirm location and date/time

  • WHAT STATE IS THE AUDIT CONDUCTED IN?

  • CABINET TYPE

  • Method of Procedure

  • PART 1 | PREPARE SITE

  • IS THE SWITCHBOARD, PIT OR POLE MOUNTED? ( RCD ) LOCATION

  • A1 - Contact FTTN NOC to “on site” as per BAU process.

  • A2 -Ensure Delivery Partner HSE requirements are applied, which shall include the use of relevant SWMS for the<br>activity undertaken.

  • A3 -Ensure safety prestart is conducted and appropriate safety controls are implemented in accordance with
    relevant SWMS, such as:

  • •Traffic and Pedestrian Management SWMS

  • • Electrical Work Activity SWMS

  • • Working at Heights (Working on poles)

  • • Working in Pits and Manholes

  • • Working on Ladders

  • • Working in EPR Zones

  • PART 2 | CONFIRM BACKUP SUPPLY & ISOLATE NORMAL SUPPLY

  • A4 - Check with FTTN NOC for remaining battery capacity. If capacity is sufficient to complete work without loss of service, proceed. If not, do not proceed.

  • A6 - Isolate at the main switchboard fuse, or only if you are authorised to isolate at utility fuse and apply lockout tag as required.

  • A7 - Test and confirm that the outgoing circuit at main switchboard is isolated.

  • A8 - At the cabinet, test and confirm that the incoming supply is isolated.

  • A9 - Perform RCA (Root cause analysis) for RCBO tripping.

  • A10- Underground Switchboards Pressure gauge reading MIN 2.5 PSI

  • A11 - Perform tests as required in AS/NZS 3000 and AS/NZS 3017

  • A21 - Ensure supply is working, cabinet is powered on and battery charging.

  • A24 - Prior to leaving the site, contact the FTTN NOC to advise job is completed.

  • A25 - Ensure supply is working and cabinet is powered on

  • A26 - Record peak start up current

  • A27 - Record steady state current

  • A28 - RECORD VOLTAGE

  • Please advise in detail what actions were performed onsite (i.e.: what fault-finding results were registered / what actions were taken to rectify the issue) address:

  • Provide noteworthy summary of site observations (such as cable damage, loose cable connections to switchboard and evidence of water ingress and vermin ingress)

  • WHO IS THE POWER UTILITY COMPANY?

  • ARTEFACTS TO SUPPLY

  • Photograph of RCD Condition on Arrival (pole, pillar or pit) switchboard.

  • Photograph of Cabinet with Node Number

  • Photograph of RCD Condition on Departure (pole, pillar or pit) switchboard.

  • Photograph of Pressure Gauge on underground switchboards

  • For pole-mounted switchboards: Photograph of conduit at top of pole (i.e. at point of connection to mains)

  • Hours on site

  • Time You Leave Site

  • Time leave site - Supply photo to confirm location and date/time

  • Travelling to next job? Record time on next job.

  • Travelling home? Finish Address

  • Time You Arrive Home

  • Time arrive at base - Supply photo to confirm location and date/time

  • SOR to be claimed Normal hours are between 6am – 6pm (Mon – Sat) - 09-01-01-09-AR

  • SOR to be claimed Any time outside normal hours including Public Holidays and if the call out is made on a Sunday - 09-01-01-09-OH

COMPLETION & SIGN-OFF

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.