Information
-
FFP
-
Conducted on
-
Prepared by
-
Contractor
-
Section of work audited - eg 7 Smith Street to 59 Smith Street
Civil & Haul
-
74.003/55.102 Have all starter pipes installed?
-
Rectified NCR Photo
-
55.102 Have all Pole to Boundary installations been done as required to facilitate provsioning?
-
Enter comments here
-
Rectified NCR Photo
-
16.027 Do all buried drop offs have a locate peg installed?
-
Enter comments here
-
Rectified NCR Photo
-
Have all manholes/pits lids been correctly installed including working locks and rubber bungs?
-
17.02 Pit lids
-
17.04 Manhole
-
Enter comments here
-
Rectified NCR Photo
-
17.021 In all pits have entry holes been cut to the right diameter so that it is tight against the ribbonet and sealed with epoxy if required?
-
Enter comments here
-
Rectified NCR Photo
-
16.026 Are all microducts correctly labelled?
-
Enter comments here
-
Rectified NCR Photo
-
Is the drop off at the customers boundary endcapped, heatshrunk and buried or in an approved enclousre - eg pedestal
-
Enter comments here
-
Rectified NCR Photo
-
Have all Flash 9's been installed in the correct orientation, and correct type? Eg Ribbonet/Aerial/Hybrid
-
Enter comments here
-
Rectified NCR Photo
-
Have all end of runs been sealed correctly and photos taken to allow the completion of the NDF13042 form?
-
Enter comments here
-
Rectified NCR Photo
-
77.013/16.010 Have all tubes in the Flash 9 been correctly sealed with duct end stops?
-
Enter comments here
-
Rectified NCR Photo
-
12.012, 17.026, 77.012 Have all right size gas seals been installed in the main joint and throughout the build? (Either 1 WMN or 12mm)
-
Enter comments here
-
Rectified NCR Photo
Aerail
-
13.028, 39.017, 39.018 Is all aerial fibre correctly secured with the appropriate number of clamps?
-
Enter comments here
-
25.012 Is any aerial fibre rubbing against a tree or concrete pole? if so, has this been covered correctly so as to not cause damage to the cable?
-
Rectified NCR Photo
-
17.001 In the Handhole or Chamber, are starter pipes/ducts the correct length (50mm) and reamed?
-
Enter comments here
-
Rectified NCR Photo
General
-
17.004, 17.005, 72.006 - Is the site free from ALL trip hazards?
-
Enter comments here
-
Rectified NCR Photo
-
77.041 Is there ANY signs of water ingress or missing grommets?
-
Enter comments below of ANY water ingress issue
-
Rectified NCR Photo
-
73.004 Are there any damaged Pillar terminals and site tidy, no task waste?
-
Enter comments here
-
Rectified NCR Photo
-
Add location