Title Page

  • Site

  • Conducted on

  • Establishment

  • Purpose Partner

  • Prepared by

Tidiness, maintenance and image

  • Facade walls. <br>Clean and in good conditions

  • Facade windows. <br>Allow wide visibility of the interior (if not, a CCTV is placed). <br>Clean and in good condition

  • Facade doors. <br>In good working conditions<br>No hard hinges<br>Door's stoppers and handrails in place

  • Lighting. <br>No missing lighting <br>Use of LED lights

Theming

  • FIB / Census Board. <br>Visible and in good conditions

  • Facade's establishment main signage. <br>Visible and no blocking objects and lighted.<br>The name of the establishment must be included and must be bilingual

  • Signs (Logo).<br>Adequate according to the facade scale (according to the original project) and in good conditions

Establishment's Queue Area <br>

  • Complies with not obstructing emergency exits or access to other establishments

  • Mark the start of the line

IDEA

  • Facade's establishment main signage. <br>The name of the establishment must be bilingual

  • Facade's Door<br>Allow the access to visitors with disabilities

  • Floor & Circulation<br>No steps or level changes

Safety & Security <br>

  • Doors. <br>Comply with not having hard hinges<br>Bruise safety system<br>Solids or made of glass (according to the specifications)

  • Floor and circulation. <br>No steps or level changes

  • Safety film or vinyl on the windows. <br>Visible in order to make them visible to visitors

  • Broken or cracked glass/window <br>Comply with not having any broken glass/windows

  • Lighting <br>Fixed<br>Adequate scale and hight in order to prevent accidents <br>At 2.10 m of height

Additional comments<br>

  • Good Practices. Represents an improvement in the service, image, or experience provided by KidZania. It can be implemented in other metropolises.

  • Additional Comments. If the evaluator detects something outstanding even though it is not considered in the present checklist

Central Government Architecture & Theming Team Evaluation<br>

  • Did the architecture & theming project delivered by the Central Government accomplish its objective? <br>

  • During the assessment, any issue was identified as a result of the original design delivered by Central Government?

  • If not, can any corrections be done immediately?

  • Can this situation be prevented in the future?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.