Title Page
-
Document Number
-
Description of Works
- Project HSE Inspection Checklist
-
Date & Month (DDMM)
-
Location (Level-Elevation/Level-Elevation/Level-Elevation) Lxx-Exx
Signatures
Name of person carrying
-
Name
Control & Check
-
ls there a register of all hazardous substances in use on the project?
-
How is this register managed and new items added to it?
-
Have substances generated by activities been considered and included? E.g. weld fumes.
-
Have Material Safety Data Sheets (MSDS) been provided?
-
Have COSHH assessments specific to the method of use been carried out? Are these up to date
-
How are the findings of the COSHH assessments and any associated controls communicated to the workforce?
-
Is there a system which manages the issuing of hazardous substances to the workforce?
-
Has anyone been appointed to manage all elements of the use of hazardous substances on the project?
-
How is the use of hazardous substances by subcontractors monitored and controlled?
-
Ensure hydraulic pump operates smoothly through entire range
-
Are those using hazardous
-
substances wearing the correct PPE as identified by the assessment?
-
Is adequate ventilation available for those using hazardous substances?
-
Are hazardous substances stored in a safe place and segregated where necessary?
-
ls there a system in place to deal with any spillage, fire, or contact with substances used on site?
-
Are first aid and emergency arrangements in place?