Title Page

  • Document Number

  • Materials Number

  • Materials Name

  • Conducted on

  • Prepared by

  • Level (xx)

  • Location

  • Document Number (xxx)

  • Location:
    E1 - Elevation 1; E2 - Elevation 2 ……
    H1 - Hoist 1; H2 - Hoist 2 ……
    S1 - Shear Wall / Stair 01; S2 - Shear Wall / Stair 02 ……
    B1 - Balcony 1; B2 - Balcony 2 ......
    P1- Plot 1; P2 - Plot 2 ……

    Code.png.jpg

Installation Company Sign Sheet

    Person
  • Name

  • Position

  • Signature

Control & Check

  • What kN value to be tested?

  • Edge protection removed locally and stacked nearly?

  • Hydra-jaws testing rig set up correctly and levelled over fixing. Adapter inserted into the testing ring & securely connected to the fixing

  • Ensure rig and puller is plumb/levelled over the bolt.

  • Hold point inspection (check equipment is set up correctly)

  • Any signs of concrete breakage around the bolt.

  • Photo record made. Set the load indicator dial to test the load of required kN and start applying pulling force until the needle reaches the pre-set indicator marker. Leave for a total of 2 minutes and monitor to check if the load applied has dropped (a loss factor 5% of the total load applied is acceptable i.e. 1.0KN). (2 Photos for each Test)

  • Any other Comments/Remarks

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.