Title Page

  • Document Number

  • Materials Number

  • Materials Name

  • Conducted on

  • Prepared by

  • Level (xx)

  • Location

  • Document Number (xxx)

  • Location:
    E1 - Elevation 1; E2 - Elevation 2 ……
    H1 - Hoist 1; H2 - Hoist 2 ……
    S1 - Shear Wall / Stair 01; S2 - Shear Wall / Stair 02 ……
    B1 - Balcony 1; B2 - Balcony 2 ......
    P1- Plot 1; P2 - Plot 2 ……

    Code.png.jpg

Signatures

  • Installation Company

  • Name

  • Signature

  • Lingyun Representative

  • Name

  • Signature

  • OSHEA Representative *optional

  • Name

  • Signature

Control & Check

  • Sika EPDM Membrane 0.6mm sealed with the base profiles, refer to Upstand Inspection Report' for the specific location. Photos are to be taken for the record.

  • Mineral insulation 60kg/m3 packed on top of the EPDM Membrane and filling all gaps between the base profiles and the aluminium copings, Photos are to be taken for the record.

  • Aluminium copings installed as per drawing: 19mm gap between panels; foam rod fixed in the gaps between panels; sika silicone sealing coverings all gaps,Photos are to be taken for the record.

  • Aluminium copings fixed with screws ,intervals are as per drawing,Photos are to be taken for the record.

  • Any other Comments/Remarks?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.