Information

  • Document No.

  • Audit Title

  • Property Reference Number

  • Conducted on

  • Prepared by

  • Location

EXECUTIVE SUMMARY

  • Assigned Case Manager

  • Assessment Report:

Introduction

  • Background

  • Labour (ref)

Summary of Electrical Works

  • Prerequisits

  • Summary of works

  • Total Number of Tasks

Summary of Plumbing Works

  • Prerequisits

  • Summary of works

  • Total Number of Tasks

Summary of General Labourer Works

  • Prerequisits

  • Summary of works

  • Total Number of Tasks

  • Open Viewing Date and Time

Tender Submission Process

  • Deadline for Submission

Tender Value Summary

  • Total Tender Value

General Introduction

  • Background

  • Property Type <br>& Brief Description

Summary of Findings

  • Summary of Condition and Proposed Refurbishment Works (please refer to table of contents for detailed assessment)

  • Assessed Area

  • Summary of Condition Assessment

  • Condition Assessment Score (%)

  • Summary of Proposed Refurbishment Works

  • Required Resources

Moving Forward

  • Current Status

  • Details

  • Next Phase

  • Details

  • Personnel required to attend

  • Site Meeting
  • Assessment Personnel

  • Refurbishment Personnel

PROPERTY ASSESSMENT REPORT

Entrance Hall

  • Entrance Hall Assessment

Condition Assessment

  • Are internal door(s) OK?

  • Required Personnel

  • Are ceilings OK?

  • Required Personnel

  • Are walls OK?

  • Required Personnel

  • Are skirting boards OK?

  • Required Personnel

  • Are floors (including floor coverings) OK?

  • Required Personnel

  • Are window(s) OK?

  • Required Personnel

  • Are all areas free from damp and mould?

  • Required Personnel

  • Are radiator(s) OK?

  • Required Personnel

  • Are light switches, fittings, & plug sockets OK? <br>(to be verified by qualified Electrician)

  • Required Personnel

  • Is the room clear of household contents?

Room Contents Analysis

  • Household Items include:

Items for Removal & Storage

  • The owner has requested that the following items are to be carefully packaged and removed from the property.
    Note: All Removal & Storage Items will be marked by a white sticker.

  • Removal & Storage, Item
  • Description of Item <br>(& Photograph)

Items for Charity

  • The owner has identified the following items to be donated, on their behalf, to a charity of their choice. Further instructions to be found within Schedule of Works Section below.

  • Charity, Item
  • Description of Item <br>(& Photograph)

Household Waste Items (for disposal)

  • The owner has identified the following items (listed below) as Household Waste Items. These items are to be removed from the property and disposed of in an appropriate way. Visit www.wastedirectory.org.uk to find your nearest waste site.

  • Discard, Item
  • Description of Item <br>(& Photograph)

  • Summary of Proposed Schedule of Works

  • Labour Requirements

Schedule of Works

  • Project Plan Status

  • Summary of Progress

  • Progress (%)

  • Total Tender Value for Area (£)

  • Total Time Required for Area

  • Estimated Capital Requirements to implement tasks(£)

  • Confirmation of Approval

  • Details of Approved Additional Works

  • Total End Cost

  • Signature of Completion

  • Project Resources (ref)

Removals

  • Removals (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS (labour reference SP1a)

  • Removals, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Removals & Storage

  • Removals & Storage (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS & STORAGE (labour reference SP1a)

  • Removals & Stroage, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Clearance & Waste Disposal

  • Clearance & Waste Disposal (SP2a) Status

  • Progress (%)

  • Notes

  • TASKS FOR CLEARANCE AND WASTE DISPOSAL (labour reference SP2a)

  • Clearance & Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Hazardous Waste Disposal

  • Hazardous Waste Disposal (SP2b) Status

  • Progress (%)

  • Notes

  • Tasks for Hazardous Waste Disposal (SP2b)

  • Hazardous Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Pest Control

  • Pest Control (ref_SP3) Status

  • Progress (%)

  • Notes

  • Tasks for Pest Control (ref_SP3)

  • Pest Control, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Security

  • Security (ref_SP4) Status

  • Progress (%)

  • Notes

  • Tasks for Security (ref_SP4)

  • Security, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Locksmith

  • Locksmith (ref_SP5) Status

  • Progress (%)

  • Notes

  • Tasks for Locksmith (ref_SP5)

  • Locksmith, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Site Preparation - Initial Cleaning Works

  • Cleaning (ref_SP6) Status

  • Progress (%)

  • Notes

  • Tasks for Cleaning (ref_SP6)

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Utilities

  • Utilities (ref_SP7) Status

  • Progress (%)

  • Notes

  • Tasks for Utilities (ref_SP6)

  • Utilities, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Electrical Works

  • Electrical Works (ref_A1) Status

  • Progress (%)

  • Notes

  • Electrical work will be carried out by an N.I.C.E.IC or E.C.A Registered Contractor (or other government approved contractor) and certification will be provided on completion of works. Please refer to Empty Home Solutions' Refurbishment Standards Booklet (Ref_A1)

  • Electrical Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plumbing Works

  • Plumbing (ref_A2) Status

  • Progress (%)

  • Notes

  • Plumbing works will be carried out by a GasSafe® registered engineer and certification will be provided on completion

  • Plumbing Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

General Labourer Tasks

  • General Labourer (ref_B1) Status

  • Progress (%)

  • Notes

  • General Labourer Tasks

  • General Labourer, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Building Works

  • Builder (ref_B2) Status

  • Progress (%)

  • Notes

  • Building Work Tasks

  • Building Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Gardening and Landscaping

  • Gardening and Landscaping (ref_B3) Status

  • Progress (%)

  • Notes

  • Gardening and Landscaping Tasks

  • Gardening and Landscaping, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Roofing & Guttering

  • Roofing & Guttering (ref_B4) Status

  • Progress (%)

  • Notes

  • Roofing & Guttering Tasks

  • Roofing & Guttering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Handyman

  • Handyman (ref_C1) Status

  • Progress (%)

  • Notes

  • Handyman Tasks

  • Handyman, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpentry & Joinery

  • Carpentry & Joinery (ref_C2) Status

  • Progress (%)

  • Notes

  • Carpentry & Joinery Tasks

  • Carpentry & Joinery, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Kitchen Fitting

  • Kitchen Fitting (ref_C3)

  • Progress (%)

  • Notes

  • Kitchen Fitting Tasks

  • Kitchen Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Bathroom Fitting

  • Bathroom Fitting (ref_C4)

  • Progress (%)

  • Notes

  • Bathroom Fitting Tasks

  • Bathroom Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Window Fitting

  • Window Fitting (ref_C4) Status

  • Progress (%)

  • Notes

  • Window Fitting Tasks

  • Window Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plastering

  • Plastering (ref_D1) Status

  • Progress (%)

  • Notes

  • Plastering Tasks

  • Plastering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Tilling

  • Tilling (ref_D2) Status

  • Progress (%)

  • Notes

  • Tilling Tasks

  • Tiling, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Painting & Decorating

  • Painting & Decorating (ref_E1) Status

  • Progress (%)

  • Notes

  • Painting & Decorating Tasks

  • Painting & Decorating, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpet Fitting

  • Carpet Fitting (ref_F1) Status

  • Progress (%)

  • Notes

  • Carpet Fitting Tasks

  • Carpet Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Cleaning

  • Cleaning (ref_G1) Status

  • Progress (%)

  • Notes

  • Cleaning Tasks

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Other

  • Other (ref_O1) Status

  • Progress (%)

  • Notes

  • Other Tasks

  • Other, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Entrance Hall

  • Entrance Hall Assessment

Condition Assessment

  • Are internal door(s) OK?

  • Required Personnel

  • Are ceilings OK?

  • Required Personnel

  • Are walls OK?

  • Required Personnel

  • Are skirting boards OK?

  • Required Personnel

  • Are floors (including floor coverings) OK?

  • Required Personnel

  • Are window(s) OK?

  • Required Personnel

  • Are all areas free from damp and mould?

  • Required Personnel

  • Are radiator(s) OK?

  • Required Personnel

  • Are light switches, fittings, & plug sockets OK? <br>(to be verified by qualified Electrician)

  • Required Personnel

  • Is the room clear of household contents?

Room Contents Analysis

  • Household Items include:

Items for Removal & Storage

  • The owner has requested that the following items are to be carefully packaged and removed from the property.
    Note: All Removal & Storage Items will be marked by a white sticker.

  • Removal & Storage, Item
  • Description of Item <br>(& Photograph)

Items for Charity

  • The owner has identified the following items to be donated, on their behalf, to a charity of their choice. Further instructions to be found within Schedule of Works Section below.

  • Charity, Item
  • Description of Item <br>(& Photograph)

Household Waste Items (for disposal)

  • The owner has identified the following items (listed below) as Household Waste Items. These items are to be removed from the property and disposed of in an appropriate way. Visit www.wastedirectory.org.uk to find your nearest waste site.

  • Discard, Item
  • Description of Item <br>(& Photograph)

  • Summary of Proposed Schedule of Works

  • Labour Requirements

Schedule of Works

  • Project Plan Status

  • Summary of Progress

  • Progress (%)

  • Total Tender Value for Area (£)

  • Total Time Required for Area

  • Estimated Capital Requirements to implement tasks(£)

  • Confirmation of Approval

  • Details of Approved Additional Works

  • Total End Cost

  • Signature of Completion

  • Project Resources (ref)

Removals

  • Removals (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS (labour reference SP1a)

  • Removals, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Removals & Storage

  • Removals & Storage (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS & STORAGE (labour reference SP1a)

  • Removals & Stroage, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Clearance & Waste Disposal

  • Clearance & Waste Disposal (SP2a) Status

  • Progress (%)

  • Notes

  • TASKS FOR CLEARANCE AND WASTE DISPOSAL (labour reference SP2a)

  • Clearance & Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Hazardous Waste Disposal

  • Hazardous Waste Disposal (SP2b) Status

  • Progress (%)

  • Notes

  • Tasks for Hazardous Waste Disposal (SP2b)

  • Hazardous Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Pest Control

  • Pest Control (ref_SP3) Status

  • Progress (%)

  • Notes

  • Tasks for Pest Control (ref_SP3)

  • Pest Control, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Security

  • Security (ref_SP4) Status

  • Progress (%)

  • Notes

  • Tasks for Security (ref_SP4)

  • Security, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Locksmith

  • Locksmith (ref_SP5) Status

  • Progress (%)

  • Notes

  • Tasks for Locksmith (ref_SP5)

  • Locksmith, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Site Preparation - Initial Cleaning Works

  • Cleaning (ref_SP6) Status

  • Progress (%)

  • Notes

  • Tasks for Cleaning (ref_SP6)

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Utilities

  • Utilities (ref_SP7) Status

  • Progress (%)

  • Notes

  • Tasks for Utilities (ref_SP6)

  • Utilities, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Electrical Works

  • Electrical Works (ref_A1) Status

  • Progress (%)

  • Notes

  • Electrical work will be carried out by an N.I.C.E.IC or E.C.A Registered Contractor (or other government approved contractor) and certification will be provided on completion of works. Please refer to Empty Home Solutions' Refurbishment Standards Booklet (Ref_A1)

  • Electrical Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plumbing Works

  • Plumbing (ref_A2) Status

  • Progress (%)

  • Notes

  • Plumbing works will be carried out by a GasSafe® registered engineer and certification will be provided on completion

  • Plumbing Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

General Labourer Tasks

  • General Labourer (ref_B1) Status

  • Progress (%)

  • Notes

  • General Labourer Tasks

  • General Labourer, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Building Works

  • Builder (ref_B2) Status

  • Progress (%)

  • Notes

  • Building Work Tasks

  • Building Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Gardening and Landscaping

  • Gardening and Landscaping (ref_B3) Status

  • Progress (%)

  • Notes

  • Gardening and Landscaping Tasks

  • Gardening and Landscaping, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Roofing & Guttering

  • Roofing & Guttering (ref_B4) Status

  • Progress (%)

  • Notes

  • Roofing & Guttering Tasks

  • Roofing & Guttering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Handyman

  • Handyman (ref_C1) Status

  • Progress (%)

  • Notes

  • Handyman Tasks

  • Handyman, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpentry & Joinery

  • Carpentry & Joinery (ref_C2) Status

  • Progress (%)

  • Notes

  • Carpentry & Joinery Tasks

  • Carpentry & Joinery, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Kitchen Fitting

  • Kitchen Fitting (ref_C3)

  • Progress (%)

  • Notes

  • Kitchen Fitting Tasks

  • Kitchen Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Bathroom Fitting

  • Bathroom Fitting (ref_C4)

  • Progress (%)

  • Notes

  • Bathroom Fitting Tasks

  • Bathroom Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Window Fitting

  • Window Fitting (ref_C4) Status

  • Progress (%)

  • Notes

  • Window Fitting Tasks

  • Window Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plastering

  • Plastering (ref_D1) Status

  • Progress (%)

  • Notes

  • Plastering Tasks

  • Plastering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Tilling

  • Tilling (ref_D2) Status

  • Progress (%)

  • Notes

  • Tilling Tasks

  • Tiling, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Painting & Decorating

  • Painting & Decorating (ref_E1) Status

  • Progress (%)

  • Notes

  • Painting & Decorating Tasks

  • Painting & Decorating, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpet Fitting

  • Carpet Fitting (ref_F1) Status

  • Progress (%)

  • Notes

  • Carpet Fitting Tasks

  • Carpet Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Cleaning

  • Cleaning (ref_G1) Status

  • Progress (%)

  • Notes

  • Cleaning Tasks

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Other

  • Other (ref_O1) Status

  • Progress (%)

  • Notes

  • Other Tasks

  • Other, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Entrance Hall

  • Entrance Hall Assessment

Condition Assessment

  • Are internal door(s) OK?

  • Required Personnel

  • Are ceilings OK?

  • Required Personnel

  • Are walls OK?

  • Required Personnel

  • Are skirting boards OK?

  • Required Personnel

  • Are floors (including floor coverings) OK?

  • Required Personnel

  • Are window(s) OK?

  • Required Personnel

  • Are all areas free from damp and mould?

  • Required Personnel

  • Are radiator(s) OK?

  • Required Personnel

  • Are light switches, fittings, & plug sockets OK? <br>(to be verified by qualified Electrician)

  • Required Personnel

  • Is the room clear of household contents?

Room Contents Analysis

  • Household Items include:

Items for Removal & Storage

  • The owner has requested that the following items are to be carefully packaged and removed from the property.
    Note: All Removal & Storage Items will be marked by a white sticker.

  • Removal & Storage, Item
  • Description of Item <br>(& Photograph)

Items for Charity

  • The owner has identified the following items to be donated, on their behalf, to a charity of their choice. Further instructions to be found within Schedule of Works Section below.

  • Charity, Item
  • Description of Item <br>(& Photograph)

Household Waste Items (for disposal)

  • The owner has identified the following items (listed below) as Household Waste Items. These items are to be removed from the property and disposed of in an appropriate way. Visit www.wastedirectory.org.uk to find your nearest waste site.

  • Discard, Item
  • Description of Item <br>(& Photograph)

  • Summary of Proposed Schedule of Works

  • Labour Requirements

Schedule of Works

  • Project Plan Status

  • Summary of Progress

  • Progress (%)

  • Total Tender Value for Area (£)

  • Total Time Required for Area

  • Estimated Capital Requirements to implement tasks(£)

  • Confirmation of Approval

  • Details of Approved Additional Works

  • Total End Cost

  • Signature of Completion

  • Project Resources (ref)

Removals

  • Removals (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS (labour reference SP1a)

  • Removals, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Removals & Storage

  • Removals & Storage (SP1a) Status

  • Progress (%)

  • Notes

  • TASKS FOR REMOVALS & STORAGE (labour reference SP1a)

  • Removals & Stroage, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Clearance & Waste Disposal

  • Clearance & Waste Disposal (SP2a) Status

  • Progress (%)

  • Notes

  • TASKS FOR CLEARANCE AND WASTE DISPOSAL (labour reference SP2a)

  • Clearance & Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Hazardous Waste Disposal

  • Hazardous Waste Disposal (SP2b) Status

  • Progress (%)

  • Notes

  • Tasks for Hazardous Waste Disposal (SP2b)

  • Hazardous Waste Disposal, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Pest Control

  • Pest Control (ref_SP3) Status

  • Progress (%)

  • Notes

  • Tasks for Pest Control (ref_SP3)

  • Pest Control, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Security

  • Security (ref_SP4) Status

  • Progress (%)

  • Notes

  • Tasks for Security (ref_SP4)

  • Security, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Locksmith

  • Locksmith (ref_SP5) Status

  • Progress (%)

  • Notes

  • Tasks for Locksmith (ref_SP5)

  • Locksmith, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Site Preparation - Initial Cleaning Works

  • Cleaning (ref_SP6) Status

  • Progress (%)

  • Notes

  • Tasks for Cleaning (ref_SP6)

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Utilities

  • Utilities (ref_SP7) Status

  • Progress (%)

  • Notes

  • Tasks for Utilities (ref_SP6)

  • Utilities, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Electrical Works

  • Electrical Works (ref_A1) Status

  • Progress (%)

  • Notes

  • Electrical work will be carried out by an N.I.C.E.IC or E.C.A Registered Contractor (or other government approved contractor) and certification will be provided on completion of works. Please refer to Empty Home Solutions' Refurbishment Standards Booklet (Ref_A1)

  • Electrical Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plumbing Works

  • Plumbing (ref_A2) Status

  • Progress (%)

  • Notes

  • Plumbing works will be carried out by a GasSafe® registered engineer and certification will be provided on completion

  • Plumbing Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

General Labourer Tasks

  • General Labourer (ref_B1) Status

  • Progress (%)

  • Notes

  • General Labourer Tasks

  • General Labourer, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Building Works

  • Builder (ref_B2) Status

  • Progress (%)

  • Notes

  • Building Work Tasks

  • Building Works, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Gardening and Landscaping

  • Gardening and Landscaping (ref_B3) Status

  • Progress (%)

  • Notes

  • Gardening and Landscaping Tasks

  • Gardening and Landscaping, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Roofing & Guttering

  • Roofing & Guttering (ref_B4) Status

  • Progress (%)

  • Notes

  • Roofing & Guttering Tasks

  • Roofing & Guttering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Handyman

  • Handyman (ref_C1) Status

  • Progress (%)

  • Notes

  • Handyman Tasks

  • Handyman, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpentry & Joinery

  • Carpentry & Joinery (ref_C2) Status

  • Progress (%)

  • Notes

  • Carpentry & Joinery Tasks

  • Carpentry & Joinery, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Kitchen Fitting

  • Kitchen Fitting (ref_C3)

  • Progress (%)

  • Notes

  • Kitchen Fitting Tasks

  • Kitchen Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Bathroom Fitting

  • Bathroom Fitting (ref_C4)

  • Progress (%)

  • Notes

  • Bathroom Fitting Tasks

  • Bathroom Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Window Fitting

  • Window Fitting (ref_C4) Status

  • Progress (%)

  • Notes

  • Window Fitting Tasks

  • Window Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Plastering

  • Plastering (ref_D1) Status

  • Progress (%)

  • Notes

  • Plastering Tasks

  • Plastering, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Tilling

  • Tilling (ref_D2) Status

  • Progress (%)

  • Notes

  • Tilling Tasks

  • Tiling, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Painting & Decorating

  • Painting & Decorating (ref_E1) Status

  • Progress (%)

  • Notes

  • Painting & Decorating Tasks

  • Painting & Decorating, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Carpet Fitting

  • Carpet Fitting (ref_F1) Status

  • Progress (%)

  • Notes

  • Carpet Fitting Tasks

  • Carpet Fitting, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Cleaning

  • Cleaning (ref_G1) Status

  • Progress (%)

  • Notes

  • Cleaning Tasks

  • Cleaning, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

Other

  • Other (ref_O1) Status

  • Progress (%)

  • Notes

  • Other Tasks

  • Other, Task
  • Task Specification <br>& Status

  • Estimated Time Required in Room (Days)

  • Materials Request

  • Purchase Request Summary (Total number of Items & Total Cost)

  • Details of Materials Requested

  • Materials Request, Item
  • Purchase Request Details<br>(Supplier, Quantity & Actual Cost)

  • Materials (£)

  • Labour (£)

  • Total Tender Value including both Materials and Labour. (£)

  • DECLARATION:
    I/we have personally inspected the tasks listed above and we sign here to certify that I/we understand the scope of works and tasks required of me/us in respect of these tasks. I confirm that I/we have signed the terms and conditions and other tender documentation.

  • Authorised Signature: (for & on behalf of Tenderee)

  • Authorised Signature: (for & on behalf of Tenderer)

DRAFT PROJECT PLAN & ESTIMATE OF CAPITAL REQUIREMENTS

SITE PREPARTION

  • Site preparation

Site Preparation

  • Preparation Resources

Removals

  • Removals Specification

  • Removals specification

  • Item

Removals & Storage

  • Removals Specification

  • Removals specification

  • Item

PROJECT PLANNING

  • Project Planning

Project Planning

  • Preparation Resources

Removals

  • Removals Specification

  • Removals specification

  • Item

Removals & Storage

  • Removals Specification

  • Removals specification

  • Item

Ongoing Project Management Reporting

  • ongoing notes

  • Entry
  • Name

  • Date and Time of Entry

  • Notes

  • attachments

  • lounge works progress (%)

Unexpected Works

EXTERNAL ASSESSMENT

Draft Refurbishment Plan

  • Phases of plan

  • Phase
  • Days

REFURBISHMENT PROJECT MANAGEMENT

Project Planning

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.