Title Page
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre-site checks
Pre-site checks
-
Have you checked the CRIP rating - if the property is tenanted
-
Have you checked the property/surrounds risk information
-
Have you completed a SWP if needed<br>
-
Have you arranged the visit as per established protocols and notified others
Self Assessment
Self assessment and Situational Awareness
-
Is my Secure Locate activated
-
Is it safe to exit my vehicle
-
Is the site secure and safe to enter
-
Am I inducted to this site
-
Am I wearing the correct PPE
Site Assessment - Part 1
Site Assessment Mandatory Section
-
Is fencing installed to prevent access to site
-
Is access control effective, no unauthorised access
-
Is "Sign in and out" system in place
-
Is the Hazard/Risk Register board in place
-
Has the Hazard/Risk Register board been updated today
-
Are the PPE requirements displayed
-
Is signage in place and appropriate for risk (e.g. report to site office, no entry, asbestos, danger)
-
Is induction offered to me
-
Are the risks on site described
-
Do the risks mentioned match the Hazard/Risk Register board
-
Are PPE requirements described
-
Is my induction recorded
Site Assessment - Part 2
Site Assessment Optional Section depending on activities on site/to be targeted
-
Emergency Equipment Section
-
Is a fire extinguisher available
-
Is the first aid kit complete and available
-
Is a spillage kit on site
-
Are risk specific Emergency Response Plans available and easy to access
-
Are emergency numbers available and easy to access
-
Documentation Section
-
Are clearance certificates on site e.g. asbestos, methamphetamine
-
Is a SSSP available on site
-
Are safety meeting minutes added to SSSP
-
Is the SSSP in daily use
-
Is SSSP content known on site
-
Are SDS available and easy to access
-
If asbestos being removed, is an Asbestos Removal Control Plan at site and being followed
-
If a Traffic Management Plan is in place, is it being followed
-
Site housekeeping and facilities Section
-
General site tidy and orderly, free of trip hazards
-
Are materials stacked safely
-
Are materials damaged beyond use (chemical decon only)
-
Are stacking areas demarcated
-
Are hazards demarcated (e.g. trenches)
-
Are waste materials stored in bins
-
Are waste materials sorted for recycling
-
Are bins used for hazardous materials lined
-
Are bins marked correctly
-
Are toilet facilities and running water accessible on site
-
Are exposed reinforcing bars capped
-
Personnel on site Section
-
ID tags carried and current
-
Supervisor or designated backup available on site during visit
-
PPE and manual handling Section
-
Are requirements known on site
-
Are all workers wearing correct PPE
-
Are there clean/contaminated areas for PPE on/off and cleaning
-
Are acceptable manual handling methods being used for tasks observed
-
Working at Height Section
-
Has the most appropriate equipment been chosen for work at height e.g. scaffolding, mobile scaffolding, elevated platform, ladder
-
Confirm no elevated work within 4 m of powerline
-
Scaffolding Section
-
Is edge protection installed effectively
-
Is the tag valid (present, weekly inspection recorded, completed in full)
-
If the scaffolding exceeds 5m in height has WorkSafe been notified<br>
-
If the scaffolding exceeds 5m in height has it been erected by a holder of a current certificate of competence
-
Is scaffolding installed to standard (incl. base boards, platforms, toe boards, stabilising legs, stand offs, gates, ladder attachments)
-
Ladders Section
-
Is the ladder set up at 1:4 ratio (1m horizontal to 4m vertical)
-
Can users maintain 3 points of contact at all times
-
Is the ladder secured at top and base to prevent slipping sideways/out
-
Do all ladders have more than 3 steps
-
Power Supply Section
-
Are safety devices in place
-
If power isolated is a lock out device in place with tag
-
Have power source (e.g. distribution box) leads been tagged
-
Are tags valid
-
Do leads appear to be in good working order
-
Are leads used in a safe manner
-
Electrical Equipment Section
-
Are power tools tagged
-
Are tags valid
-
Do the power tools appear to be in good working order
-
Tools & Machinery Section
-
Are safety devices operable i.e. not tampered with
-
Are the right tools or machinery being used for the job
-
Are all dangerous parts guarded
-
Do all tools and machinery appear to be in good working order
-
Hazardous Substances Section
-
Is dust control in place at source for respirable dust and/or paint particles e.g. timber, silica, lead based paint
-
Are lead test results on site
-
Is plastic sheeting in place for lead based paint removal <br>
-
Is HNZ permitted method used for lead based paint removal (chemical stripping, wet scraping, wet hand sanding, low-temperature heat processes (under 200°c))<br>
-
Pre-line quality inspection section
-
Is building paper installed in accordance with approved plan
-
Has correct insulation product type been used
-
Is insulation installed in accordance with approved plan
-
Post decontamination & Prestart quality inspection section
-
Is the property secured (e.g. windows and doors closed/boarded)
-
Are all skip bins and refuse removed
-
Is electrical isolation completed appropriately (e.g. as per Completed Works Form)<br>
-
Have wires been cut to length that is reusable (i.e. not too short)<br>
-
Is the condition of timber where paint has been removed acceptable
-
Have all tenant belongings and soft furnishings been removed
-
Have the grounds been maintenance (e.g. length of lawn)
-
Is a copy of an asbestos survey present at site (prestart only)<br>
-
Are any items identified that have not been included in the architects plan i.e. potential variations (prestart only)
-
Is there room at site for bin storage and contractor parking (prestart only)
-
Post-line quality inspection section
-
Is Gib on bracing walls fixed in accordance with bracing plans (include photos of each labelled bracing wall)
-
Practical completion quality inspection section
-
Are exterior site works completed in accordance with Scope of Works
-
Are exterior building envelope and structure completed in accordance with Scope of Works
-
Are interior works completed in accordance with Scope of Works<br>
-
Are interior joinery completed in accordance with Scope of Works<br>
-
Have wires been cut to length that is reusable (i.e. not too short)<br>
-
Are building services completed in accordance with Scope of Works
-
Are services completed in accordance with Electrical Plan
-
Are floor finishes completed in accordance with floor finishing plan
Summary
Positive Observations
-
Add media
Opportunities for improvement
-
Add media
Actions completed at site
-
Add media
Agree future/corrective actions
-
Add media