Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PROCEDURAL CHECKLIST

  • In use

VERIFICATION CHECKLIST

  • In use

  • TEST RESULTS

  • Attached to checklist

NON-CONFORMANCE

  • Identified by Contractor

NON-CONFORMANCE REPORT

  • Submitted

UNDERLYING LOT

  • Conforms

  • Foundation compacted as per table

COMPACTED LAYER METHOD Clause R 22.5.2(ii)

  • Up compacted layer=<400mm

  • Rock size in fill 2/3 layer depth.

  • Approval to vary layer thickness.

  • Density test results 95% >600mm below.

  • Density test results 100% 200-600 mm below

  • Compacted layer method spec used.

  • Maximum compacted layer thickness.

  • Minimum number of passes.

  • Batter slope tolerances.

  • Layer toleranced

  • Tolerances met 0mm above to 60mm below

MECHANICAL INTERLOCK Clause R22.5.2(iii)

  • Correct roller category

  • Drum mass > 4.5t

  • Maximum compacted layer thickness.

  • Minimum number of passes.

  • Proof rolling conforms.

CHANGE IN METHOD clause R22.5.2(iii)

  • Stone binding placed

  • Class of geotextile

  • Geotextile overlap 500mm

SOUND MOUNDS Clause R 22.5.3

  • Uncompacted layer =< 450mm

  • Maximum Rock size <150mm

  • Density test results

NON-CONFORMANCE

  • Identified by audit.

  • Report requested.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.