Title Page

  • Document No.

  • ENVIRONMENTAL MANAGEMENT

  • Department of State Growth

  • Conducted on

  • Prepared by Harold Percey

  • Location
  • Personnel

Site general

  • Contained within Limits of Contract

  • Points of access as per drawings.

  • Damaged property access reinstated

  • Farm gates closed after hours.

ENVIRONMENTAL MEETING

  • Meeting convened

  • All parties in attendance

  • Protection measures required

  • Environmental obligations identified

APPROVALS outside Reserve

  • Written authorisation from DPIWE for use

  • Approval from local planning Authority

  • Copies of correspondence provided

APPROVALS offices, sheds, stockpiles, dump site.

  • Site outside limits of contract approved by Superintendant

APPROVALS pits and quarries

  • Evidence of existing license provided.

APPROVALS Cartage over Council And Private roads

  • Evidence provided approving cartage.

ENVIRONMENTAL MANAGEMENT

  • Noise minimised where practicable

  • Noise suppressor a fitted to equipment.

  • Loud hailers not used for communications.

  • Trimming of vegetation minimised

  • Trees preserved as indicated.

  • Penalties imposed as per specification

ABORIGINAL ARTIFACTS

  • Uncovered by the works.

  • Unanticipated discovery procedure followed.

TOPSOIL

  • Stockpiled on protected area

  • Not removed from site.

RUN OFF

  • Oil, grease, waste material contained.

  • DPIWE satisfied run off management.

HAZARDOUS MATERIALS

  • Incident control procedures adopted

  • Any hazardous materials discovered.

  • Any areas contaminated by spills.

  • Spills reported as specified.

SITE QUARANTINE

  • No soil, seeds, and organic matter removed.

  • Earth moving machinery washed down.

LIGHTING OF FIRES

  • Fires not lit any purpose.

  • Fire Service Act observed.

  • Permission obtained

  • 24hr notice to property owners.

STRUCTURALLY DAMAGING PROCESSES

  • Dilapidation reports in accord with specification.

  • Reports initialled by all signatories.

  • Hold point submitted prior to works.

  • Any structural damage identified.

  • Use of vibrating plant

  • Blasting licences obtained

  • Distance to high pressure gas pipelines>500m

  • Use of explosives as per standards.

  • Copy of each firing provided.

  • Appropriate signage erected prior to blast

  • Residents notified prior to blast.

STREAM FLOW AND FLOODING

  • Temporary stream diversion approved

  • Normal stream flow not impeded.

  • Works secure from flow and flooding

LANDSCAPING

  • Seed mixtures- type mix application

  • Trackifier non-toxic to flora and fauna.

  • Fertiliser- type, application rate

  • Set- out of planting areas approved

  • All planting season > 1.5m clear of drain inverts.

  • Plants inspected and approved by the Superintendent.

  • Herbicide spraying conforms to DPIPWE GUIDELINES

  • Plants free insect infestation and disease.

  • Dying plants replaced by Contractor.

ENVIRONMENT PROTECTION

  • Sediment traps installed below outlets

  • Silt stop fences installed prior to earthworks.

  • Silt stop fences removed on completion.

  • Fencing for preserved sites.

ENVIRONMENTAL COMPLETION AUDIT

  • Completed by accredited professional

  • 3rd party audit provided prior to PC.

NON CONFORMANCE

  • Identified by audit

REPORT REQUESTED.

  • Sign

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.