Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROCEDURAL CHECKLIST
-
Inuse
TEST RESULTS
-
Attached to checklist
NON-CONFORMANCE
-
Identified by Contractor.
NON_CONFORMANCE REPORT
-
Submitted.
NOMINATED MATERIAL Clause R40.5
-
Nomination of materials form R40.5 submitted.
-
Nominated target grading received.
-
Test data to demonstrate compliance.
-
Representative samples received.
-
%passing grading serve sizes.
-
CBR minimum 15 minus 19mm fraction.
-
Fine aggregate liquid limit maximum 40
-
Fine aggregate plastic index max. 20.
-
Fines PI x% passing 0.425mm max 450
-
Hold point released for nomination
-
Hold point released change target grading.
AUDIT SAMPLE Appendix A4
-
%passing grading serve sizes
-
Grading ratio limits % passing.
-
CBR min 15 minus 19mm fraction.
-
Fine aggregate liquid limit max. 45
-
Fine aggregate plastic index max. 25.
-
Fines PI x % passing 0.425mm max. 600
CONSTRUCTION Clause R40.7
-
Underlying lot conforms
-
Material uncontaminated.
-
Layer maximum thickness 250mm
-
Density test results min 95%
-
Pavement width.
-
Uniformity and finish.
-
Hold point released top of course.
COMPLETED SURFACE Clause R40.8
-
Level, grade, shape as designed.
-
Completed surface toleranced.
-
Tolerances satisfied.-40mm to +20mm
-
NON-CONFORMANCE
-
Identified by audit
-
Report requested.
-
Signature