Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • In use

VERIFICATION CHECKLIST

  • In use

Test results

  • Attached to checklist

NON-CONFORMANCE

  • Identified by Contractor

NON-CONFORMANCE REPORT

  • Submitted

SERVICES

  • Identified and protected

MATERIALS Clause R 33.2

  • Pipe type and class

  • Pipe dia 100mm

  • Filter material maximum size 19mm

  • Geotextile class C

  • Flush point pipe dia > 50mm

  • Drain markers yellow triangular plates

TRENCH EXCAVATION Clause R 33.3.1

  • Location correct

  • Width 300mm

  • Minimum depth 500mm below formation

  • Minimum grade 1%

  • Rock encountered

  • Rock volume measured

INSTALLATION Clause R 33.3

  • Pipe on 50mm bed of filter material

  • Pipe deviation <40mm line and grade

  • Top of pipe 100mm below sub base

  • Geotextile lap 250mm on top

  • Geotextile lap 500mm at joins

  • Compaction method filter material as per CMP

  • Connection to pits etc.

  • End wall construction

  • Pipe surround grouted to endwall

  • Dead end capped

  • Flush points at 120m maximum intervals

  • Flush point demonstration of compliance

  • Drainage markers at all locations

  • Lemon yellow markers in Rock cuttings

NON-CONFORMANCE

  • Identified in audit

  • Report requested.

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.