Information

  • Document No.

LGB Monthly Fire Extinguisher Inspection

  • Conducted on

  • Prepared by

  • Location- Verify you are conducting Monthly Fire Extinguisher Inspection for LGB by entering "LGB" below.

FIRE EXTINGUISHER INSPECTION INSTRUCTIONS Each fire extinguisher (Facility and Vehicle) needs to be inspected and signed off each month. The inspections should at a minimum include: o A visual inspection of the overall condition of the extinguisher and bracket. o Is the pressure gauge in the green? o Is the safety pull pin secured and in place? o Look at the discharge hose to be sure it is not pinched or damaged; be sure the end is not clogged, etc. o Is the monthly inspection tag attached and signed each month? o Is the annual inspection label attached? Is the annual inspection past due? o For wall mounted extinguishers there must be a clear path to the fire extinguisher- be sure there is nothing blocking access to the fire extinguisher, is there a sign on the wall identifying the extinguisher location? Is there a red box painted on the floor to show nothing should be stored in this area? o Any spare fire extinguishers should be stored in such a way as they are protected from falling over, and still need to be inspected monthly. o Any used or Out of Service fire extinguishers must be LOTO until they can be properly disposed of, and stored in a location where they will NOT be accessible in case of an emergency.

  • FIRE EXTINGUISHER<br>INSPECTION INSTRUCTIONS CON’T<br><br>Answering "S" for Satisfactory means you agree that you have performed the above required monthly inspection and initialled the monthly inspection tag. <br>If you answer "C" for Comment, please add a brief description of what the issue is and remove the fire extinguisher from service. Create a follow up action item to be sure the issue addressed, and replace the fire extinguisher with a spare. <br>Click YES to confirm you understand how to perform the Monthly Fire Extinguisher Inspection.<br>

LGB Line Room

  • LR-1<br>Annual Due in August,<br>Hydrostatic Test Due August XXXX

LGB Main Hangar

  • Main Hangar -1<br>Annual Due in August, <br>Hydrostatic Test Due August XXXX

  • Main Hangar -2<br>Annual Due in August, <br>Hydrostatic Test Due August XXXX

  • Main Hangar -3<br>Annual Due in August, <br>Hydrostatic Test Due August XXXX

  • Main Hangar -4<br>Annual Due in August, <br>Hydrostatic Test Due August XXXX

LGB Hangar 5

  • Hangar 5- 1, <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

  • Hangar 5- 2, <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

LGB Hangar 6

  • Hangar 6- 1, <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

  • Hangar 6 -2, <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

EXEC Farm

  • Exec Farm- 1 <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

  • Exec Farm- 2<br>Annual Due August, <br>Hydrostatic Test Due August XXXX

  • Exec Farm- 3 <br>Annual Due August, <br>Hydrostatic Test Due August XXXX

LGB EXEC Ramp

  • Exec Ramp- 1<br>Annual Due August, <br>Hydrostatic Test Due August XXXX

LGB Fuel Trucks

  • Truck 11- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 11- 2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 12- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 12- 2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 16- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 16-2,,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 34- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 34-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 35- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 35-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 54-1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 54-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 55- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 55-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 56-1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 56-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 59- 1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 59-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 60-1,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

  • Truck 60-2,<br>Annual Due in August,<br>Hydrostatic Test due August XXXX

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.