Title Page

  • Site conducted

  • Conducted on

  • Prepared by

MAINTENANCE ORGANISATION CERTIFICATION AND APPROVAL<br>RENEWAL INSPECTION CHECK

FACILITY REQUIREMENTS. Are the following satisfactory:

  • Facilities for planned work (protection from weather, segregation of work areas)?

  • Office Accommodation (including quality, planning, technical records)?

  • Appropriate work environment (special requirements observed, not impair effectiveness)?

  • Storage facilities and conditions (restricted access, manufacturer’s instructions, segregation)

AMO ADMINISTRATION. Are the following satisfactory:

  • Trained and experienced maintenance personnel, authorized engineers and authorized aviation repair specialists where required?

  • Nominated management persons have a responsibility to ensure that the<br>compliance with AMO Regulations?

  • Nominated senior person responsible for quality system?

  • Man-hour plan/sufficient personnel/procedure to reassess work?

  • Personnel competence procedure for maintenance, quality audits?

  • NDT staff qualified.

  • Is certification authorization issued in writing to appropriately qualified engineers<br>for issue of CRS?

  • Does the authorization clearly specify the scope and limits of such certification<br>authorization and contain a unique certification authorization number for each<br>certifying staff?

  • Are components workshop personnel appropriately trained and qualified

  • Are certifying staff trained and qualified as required by Part 6 NCAR’s?

REQUIREMENTS FOR CERTIFYING STAFF

  • Do certifying staff have adequate understanding of relevant aircraft/component and organization procedures?

  • Do certifying staff have at least 6 months actual maintenance experience in any 2 year period?

  • Do certifying staff have continuation training each 2 years in relevant technology,<br>organization procedures, human factors?

  • Is the programme for continuation training, and procedure for compliance<br>satisfactory?

  • Are certifying staff assessed for competence, qualification, and capability prior to<br>issue or re-issue of authorization.

  • Does the authorization document specify scope/limit of authorization

  • Is the procedure for authorizing certifying staff documented and satisfactory

  • Is the person responsible for the quality system also responsible for the issue of<br>certification authorization?

  • Is the record of certifying staff, including licence/training/scope of authorization<br>satisfactory?

  • Are certifying staff provided with copy of authorization document?

  • Are certifying staff required to produce authorization document in reasonable time?

EQUIPMENT, TOOLS AND MATERIAL. Are the following satisfactory:

  • Necessary equipment, tools and material?

  • Control and calibration?

  • Records of calibration and standard used?

AIRWORTHINESS DATA

  • Hold and use applicable current approved data

  • Minimum data to hold and use include maintenance related CARs, Advisory<br>Circulars, Approved Maintenance Programme, MM, SRM, IPC, CPCP, SSID, NDI<br>Manuals, Process Specifications , Service Letters & Instructions, Vendor<br>Maintenance and Repair manuals

  • Maintenance instructions prepared in accordance with approved

  • Procedure for appropriate action of damage assessment and use of only approved<br>repair data

  • Common work card or worksheet system for organization or procedures to complete<br>ones provided by operator

  • Is applicable maintenance data readily available

  • Is controlled data up to date?

  • Is there written confirmation of amendment status?

MAINTENANCE CERTIFICATION

  • Is issue of certificate of maintenance done by authorized certifying staff when all<br>maintenance has been carried out?

Does the Certificate of Release to service(CRS) contain:

  • Date maintenance was completed?

  • Details of maintenance carried out?

  • Name and unique authorization number of the certifying staff and his signature?

  • Name and certificate number of the Repair Station/AMO?

  • An airworthiness compliance statement?

  • Procedure for re-certifying Used aircraft component?

  • Is incomplete maintenance entered on CRS?

  • Prohibiting fitment of component without appropriate release to service documents?

  • Is it clear that a CRS must not be issued in cases of non-compliance and which<br>could hazard flight safety?

MAINTENANCE RECORDS

  • Do the maintenance records contain a detailed record of work?

  • Is a copy of the CRS and repair/modification data provided to the Operator?

  • Are records retained for 2 years from date of release?

REPORTING OF UNAIRWORTHY CONDITIONS

  • Report to CAA and type certificate holder conditions hazardous to aircraft?

  • Unairworthy report forms?

  • Report to Manufacturer?

  • Report within 3 days?

MAINTENANCE PROCEDURES AND QUALITY SYSTEM

  • Is Quality policy included in MPM?

  • Do maintenance procedures to ensure good maintenance practices comply with?<br>AMO

  • Quality system with independent audits with feedback system which ensures proper<br>and timely corrective action?

  • Review of audit reports (deficiencies and implemented corrective actions)

MAINTENANCE PRCEDURES MANUAL (MPM) PRIVILEGES OF THE AMO

  • Maintain aircraft and components per approval?

  • Other organizations doing maintenance under the quality system?

  • Other location maintenance subject to need due un serviceability or occasional line<br>per MPM procedures?

  • Line maintenance per MPM permission and listing?

  • CRS issued i.a.w. Part 6 – AMO requirements

LIMITATIONS OF THE APPROVED MAINTENANCE ORGANIZATION

  • Is maintenance done only when all necessary facilities, equipment, tooling, material,<br>approved data and certifying staff are available?

CHANGES TO THE APPROVED MAINTENANCE ORGANIZATION

  • Is the CAA notified of changes of name, location, additional locations, accountable<br>manager, senior persons, facilities, equipment, tools, material, procedures, work scope and certifying staff that could affect the approval?

  • Has the CAA prescribed operating conditions during changes

CONTINUED VALIDITY OF APPROVAL

  • Remaining in compliance with AMO Regulations?

  • The CAA being granted access to the AMO?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.