Information

  • Site

  • Plumbing Approval Number:

  • Date and Time of Inspection

  • Prepared by (Full Name)

  • Location

Primary Tank

Primary Tank

  • Tank riser(s) and lid(s) above normal ground level

  • Tank lids accessible for routine inspection

  • Tank lid(s) securely fastened and sealed

  • Manhole riser is in sound condition (no distortion)

  • Inlet junction in place and clear of obstructions

  • Access stop-end on inlet junction

  • Outlet junction in place and clear of obstructions

  • Access stop-end on outlet junction

  • Effluent filter correctly positioned in outlet junction

  • Effluent filter in clean

  • Visual condition of contents of primary tank

  • Determination of scum and sludge levels

  • Correct ventilation of primary tank:

For Biorock- S/-L/-E and Biorock-5/-10/-15 installations:

  • Air outlet pipe vertical riser is less than 10m from outlet on tank

  • Air outlet pipe fitted with long radius bends or 2x 45-degree bends only

  • Air outlet pipe free from damage (visual inspection only)

  • Air outlet pipe securely fastened

  • Wind-driven ventilator fitted to air outlet pipe

  • Wind-driven ventilator clear of obstructions and spins freely

  • Wind-driven ventilator is more than 4m above corresponding air inlet on system (either primary tank or BIOROCK)

  • No air inlet on primary tank

For ECOROCK-1000/-1500/-2000/-3000 installations:

  • Air outlet pipe vertical riser is less than 10m from outlet on tank

  • Air outlet pipe fitted with long radius bends or 2x 45-degree bends only

  • Air outlet pipe free from damage (visual inspection only)

  • Air outlet pipe securely fastened

  • Wind-driven ventilator fitted to air outlet pipe

  • Wind-driven ventilator clear of obstructions and spins freely

  • Wind-driven ventilator is more than 4m above corresponding air inlet on system (either primary tank or BIOROCK)

  • No air inlet on primary tank

For BIOROCK-F/-30, and ECOROCK-5000 installations:

  • Air outlet pipe vertical riser is less than 10m from outlet on tank

  • Air outlet pipe fitted with long radius bends or 2x 45-degree bends only

  • Air outlet pipe free from damage (visual inspection only)

  • Air outlet pipe securely fastened

  • Wind-driven ventilator fitted to air outlet pipe

  • Wind-driven ventilator clear of obstructions and spins freely

  • Wind-driven ventilator is more than 4m above corresponding air inlet on system (either primary tank or BIOROCK)

  • Air inlet fitted with mushroom vent cowl

  • Air inlet pipe is 200mm - 400mm above NGL

  • Air inlet pipe is clear of obstructions

For MULTIROCK installations:

  • Each primary tank is independently vented

BIOROCK/ECOROCK treatment unit:

BIOROCK/ECOROCK treatment unit:

  • Tank riser(s) and lid(s) above normal ground level

  • Tank lids accessible for routine inspection

  • Tank lid(s) securely fastened and sealed

  • Manhole riser is in sound condition (no distortion)

  • Flooding alarm indicator installed and in working order

  • Inlet manifold clean (clean at every service)

  • Inlet manifold hanger brackets securely fastened

  • Inlet manifold correctly set to ensure distribution across media (set at every service after cleaning)

  • For MULTIROCK installations: inlet water distribution is equal between ECOROCK units

  • Top (first) layer of media in good condition

  • Second layer media in good condition

  • Media bed in place and not obstructing air flow in aeration layer

  • Correct ventilation of BIOROCK/ECOROCK unit:

For BIOROCK-S/-L/-E/-F, BIOROCK-5/-10/-15/-30, and ECOROCK-5000 installations:

  • Air outlet pipe vertical riser is less than 10m from outlet on tank

  • Air outlet pipe fitted with long radius bends or 2x 45-degree bends only

  • Air outlet pipe free from damage (repair if necessary)

  • Air outlet pipe securely fastened (repair if necessary)

  • Wind-driven ventilator fitted to air outlet pipe

  • Wind-driven ventilator clear of obstructions and spins freely

  • Wind-driven ventilator is more than 4m above corresponding air inlet on system

  • Air inlet fitted with mushroom vent cowl

  • Air inlet pipe is 200mm - 400mm above NGL

  • Air inlet pipe is clear of obstructions

For ECOROCK-1000/-1500/-2000/-3000 installations:

  • Air inlet fitted with mushroom vent cowl

  • Air inlet pipe is 200mm - 400mm above NGL

  • Air inlet pipe is clear of obstructions

  • Air hole on ECOROCK water inlet is clear of obstructions

For ECOROCK-1000/-1500/-2000/-3000 installations where the primary tank is more than 3m from ECOROCK unit:

  • Air outlet pipe vertical riser is less than 10m from outlet on tank

  • Air outlet pipe fitted with long radius bends or 2x 45-degree bends only

  • Air outlet pipe free from damage (visual inspection only)

  • Air outlet pipe securely fastened

  • Wind-driven ventilator fitted to air outlet pipe

  • Wind-driven ventilator clear of obstructions and spins freely

  • Wind-driven ventilator is more than 4m above corresponding air inlet on system (either primary tank or BIOROCK)

  • Air inlet fitted with mushroom vent cowl

  • Air inlet pipe is 200mm - 400mm above NGL

  • Air inlet pipe is clear of obstructions

For MULTIROCK installations:

  • Each BIOROCK/ECOROCK unit is independently vented

Pump Shaft

Pump Shaft

  • Shaft riser(s) and lid(s) above normal ground level

  • Shaft lids accessible for routine inspection

  • Shaft lid(s) securely fastened and sealed

Correct ventilation of pump shaft as required for BIOROCK-S/-L/-E/-F and BIOROCK-5/-10/-15/-30, and recommended for ECOROCK-1000/-1500/-

  • Air inlet fitted with mushroom vent cowl

  • Air inlet pipe is 200mm - 400mm above NGL

  • Air inlet pipe is clear of obstructions

  • Remove pump, test float switch operation, clean, install, and test operation

Items Used

Items Used

  • Brush filter

  • Wind ventilator

  • Lid brackets

  • Mushroom Vent Cowel

  • Pump Kit

  • Flooding Alarm

  • S/S Threaded Rod

  • S/S Nuts

  • S/S Bolts

  • S/S Washer

  • S/S L-bracket

  • Holderbat

  • Media 20x20

  • Media 10x10

  • Aeration Rings

  • 110mm Pipe (m)

  • 50mm Pipe (m)

  • 110mm Long Radius Bend

  • 110mm Elbow 45

  • 110mm Elbow 90

  • 110mm T-Piece

  • 110mm Socket

  • 50mm PVC Ball Valve

  • 50mm T-Piece

  • 50mm Elbow 45

  • 50mm Elbow 90

Completion

Completion

  • Inspection Result

  • Are all tank lids securely fastened and sealed

  • Recommendations

  • Full Name and Signature of Inspector

  • Full Name and Signature of Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.