Title Page
-
The Mill
undefined
-
-
-
Plot 34
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- #38
- 39
- 40
- 41
- 42
- 43
- 44
-
Level 3
- Basement
- Ground floor
- 1st floor
- 2nd floor
- 3rd floor
- Roof
-
Block 2
-
Conducted on
-
Prepared by
-
Location
Untitled Page
Untitled Page
Untitled Page
-
Pre 2nd fix inspection
-
Is the unit clean and ready to commence work
-
Are all structural door openings correct
2nd fix Q&A sign off
-
Have all door linings been installed plumb and in wined
-
Is the gap to frame and opening correct to manufactures specs with correct fire foam used
-
Have the doors been swung the correct direction
-
Do all doors have the correct margins 2mm - 4mm
-
Are all hinges flush with all screws fitted
-
Have latches/locks/receivers been correctly cut at correct heights
-
Have doorstops been fitted with enough fixings & correct rattle on door
-
Have architraves been fitted neatly/flush with enough fixing.
-
Has skirting been used as architrave if gap is under 25mm to wall (if suitable)
-
Is there a maximum of 5mm gap to bottom of architrave
-
Have all scribes and mitres to skirting been correctly fitted within tolerance.
-
Has all skirting been glued and fixed correctly
-
Has curtain battens been installed with correct fixings and arris removed.
-
Has the unit been left clean and tidy
Signatures
-
Supervisor
-
Providence Manger