  • Pre 2nd fix inspection

  • Is the unit clean and ready to commence work

  • Are all structural door openings correct

2nd fix Q&A sign off

  • Have all door linings been installed plumb and in wined

  • Is the gap to frame and opening correct to manufactures specs with correct fire foam used

  • Have the doors been swung the correct direction

  • Do all doors have the correct margins 2mm - 4mm

  • Are all hinges flush with all screws fitted

  • Have latches/locks/receivers been correctly cut at correct heights

  • Have doorstops been fitted with enough fixings & correct rattle on door

  • Have architraves been fitted neatly/flush with enough fixing.

  • Has skirting been used as architrave if gap is under 25mm to wall (if suitable)

  • Is there a maximum of 5mm gap to bottom of architrave

  • Have all scribes and mitres to skirting been correctly fitted within tolerance.

  • Has all skirting been glued and fixed correctly

  • Has curtain battens been installed with correct fixings and arris removed.

  • Has the unit been left clean and tidy

Signatures

  • Supervisor

  • Providence Manger

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.