Plot Details
-
Conducted on
-
Builder
-
Site
-
Plot Number
-
Prepared by
-
Location
Externals
-
Gutters installed & clipped at the correct centres using domehead screws
-
Rainwaters installed clipped uniformly & offsets straight at the top
-
Have domehead screws been used in RW brackets
-
Safety discharge fitted & returned to wall (Combi)
-
Safety discharge cage fitted & copper pipe fitted to a distance of 75-25mm from ground level
-
Lead work dressed, trimmed & patinated
-
Flue sealed externally & external seal fitted
-
External tap fitted
-
Gas meter connected & pipe clipped
Heating
-
Boiler installed & commissioned
-
Boiler pipe work insulated
-
Is flue sealed
-
Controls fitted & operating as per design
-
Condensate pipe installed & insulated (if in garage)
-
15mm discharge fitted using compression fitting to connect
-
Radiators fitted level & correct spec
-
Towel rails fitted
-
Electrical element fitted to TR
-
Bypass radiators fitted in room with thermostat control
-
All radiators heating & balanced as per heating designs (zones)
-
Pressure set to between 1 & 1.5 bar
Domestic Sinks
-
Sink unit installed, waste & overflow tested
-
Main stopcock, DCV, PRV & drain cock fitted
-
Utility sink installed, waste & overflow tested
-
Remote washing machine valve & trap fitted
-
DCVs fitted to all appliance valves
-
Stopcock & DCV fitted to external tap
-
Rosettes & labels fitted
Cylinder
-
Cylinder installed & insulated
-
Cylinder signed off
-
Cylinder controls ID labelled
-
Safety discharge fitted in accordance to the regulations (minimum 300mm before a bend)
-
Pipes all clipped
-
Pressure vessels installed
Cloakroom
-
WC & WHB fitted & tested
-
WC & WHB fixings fitted with plastic washers or Fischer bolts
-
WC seat fitted & secure
-
Screw cap covers fitted to WC
-
Isolation valves fitted to all water supplies
-
Hot/Cold supplies correct
Bathroom
-
WC & WHB fitted & tested
-
WC & WHB fixings fitted with plastic washers or Fischer bolts
-
WC seat fitted & secure
-
Screw cap covers fitted to WC
-
Isolation valves fitted to all water supplies
-
Hot/Cold supplies correct
-
Bath installed & overflow tested
-
Blending valve installed & tested (set to 38 degrees)
-
Bath screen installed as per specifications
-
Shower tray installed & tested
-
Shower grating cover fitted
-
Shower fitted & working correctly
-
Shower kit fitted & secure
-
Shower screen fitted & operational
En-Suite 1
-
WC & WHB fitted & tested
-
WC & WHB fixings fitted with plastic washers or Fischer bolts
-
WC seat fitted & secure
-
Screw cap covers fitted to WC
-
Isolation valves fitted to all water supplies
-
Hot/Cold supplies correct
-
Bath installed & overflow tested
-
Blending valve installed & tested (set to 38 degrees)
-
Bath screen installed as per specifications
-
Shower tray installed & tested
-
Shower grating cover fitted
-
Shower fitted & working correctly
-
Shower kit fitted & secure
-
Shower screen fitted & operational
En-Suite 2
-
WC & WHB fitted & tested
-
WC & WHB fixings fitted with plastic washers or Fischer bolts
-
WC seat fitted & secure
-
Screw cap covers fitted to WC
-
Isolation valves fitted to all water supplies
-
Hot/Cold supplies correct
-
Bath installed & overflow tested
-
Blending valve installed & tested (set to 38 degrees)
-
Bath screen installed as per specifications
-
Shower tray installed & tested
-
Shower grating cover fitted
-
Shower fitted & working correctly
-
Shower kit fitted & secure
-
Shower screen fitted & operational
Testing
-
Gas test done & certified
-
Benchmark & analyser done & certified
-
Drain test complete
-
Air source commission complete & certified
-
Ubinks clipped & connected
-
Air admittance valve installed where applicable