Title Page

  • Development

  • Apartment Number

  • Work Completed By

  • Conducted on

  • Prepared by

  • Comments / Issues

  • RNM Electrician / Installer Signature

  • RNM Supervisor Signature

  • Renaker Manager Signature

Clashes & Issues

  • Any Clashes or Issues

  • Issues Detailed

  • Photo Evidence

Mid Fix Checklist

  • All cables have been brought through ceilings and walls where necessary & positioned correctly.

  • Ensure all light switches, socket outlet boxes cut out & fitted correctly after 2nd side boarding.

  • Apartment has been left in a clean and tidy state with rubbish removed into the bins provided.

  • Cables where accessories are to be fitted are visible and do not appear to be trapped in any locations.

  • Apartment Drawings

  • Apartment Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.