Title Page
-
Development
- Trinity Island D2
- Vita T2
- Bankside
- Crown Street C5
- Port Street
- 1st Street
-
Floor
-
Work Completed By
-
Conducted on
-
Prepared by
-
Comments / Issues
-
RNM Electrician / Installer Signature
-
RNM Supervisor Signature
-
Renaker Manager Signature
Corridor Mid Fix Checklist
-
Cables brought through ceilings, wall where necessary & positioned correctly
-
Ensure all light switches and socket outlet boxes are cut out & fitted correctly after 2nd side boarding
-
Area left clean & tidy/rubbish removed into bins provided
-
Cables visible and not trapped at all spotlights & smokes
-
Corridor Drawings
-
Corridor Photos
Clashes & Issues
-
Any Clashes or issues
-
Issues Detailed
-
Photo Evidence