Title Page

  • Development

  • Floor

  • Work Completed By

  • Conducted on

  • Prepared by

  • Comments / Issues

  • RNM Electrician / Installer Signature

  • RNM Supervisor Signature

  • Renaker Manager Signature

Corridor Mid Fix Checklist

  • Cables brought through ceilings, wall where necessary & positioned correctly

  • Ensure all light switches and socket outlet boxes are cut out & fitted correctly after 2nd side boarding

  • Area left clean & tidy/rubbish removed into bins provided

  • Cables visible and not trapped at all spotlights & smokes

  • Corridor Drawings

  • Corridor Photos

Clashes & Issues

  • Any Clashes or issues

  • Issues Detailed

  • Photo Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.