Title Page

  • Development

  • Floor

  • Work Completed By

  • Conducted on

  • Prepared by

  • Comments / Issues

  • RNM Electrician / Installer Signature

  • RNM Supervisor Signature

  • Renaker Manager Signature

Corridor 2nd Fix Checklist

  • All corridor lighting and PIR's installed, flush and working

  • All emergency lighting installed, flush and working

  • All cleaners' sockets installed and levelled

  • All fused spurs installed and levelled

  • All heaters installed

  • All fire alarm smoke detectors installed

  • Fire alarm interfaces connected and addressed

  • AOV link connected, and resistor fitted

  • Area left clean and tidy/ rubbish removed to bins provided

  • Corridor Drawings

  • Corridor Photos

Clashes & Issues

  • Any Clashes or issues

  • Issues Detailed

  • Photo Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.