Title Page
-
Site
-
Apartment Number
-
Work Completed By
- Callam Joel
- James Whaley
- Paul Henry
- Ryan Cullen
- Emerson Goodridge
- Gareth Morgan
- Oliver Doherty
-
Conducted on
-
Prepared by
-
Comments
-
RNM Supervisor Signature
2nd Fix Checklist
-
All circuits fully 2nd fixed, nothing missing & checked with drawing.
-
All appliances connected
-
All fire and acoustic inserts installed to nominated external & interconnecting fire walls
-
Smoke & heat alarm interconnection tested
-
All lights switching correctly ie: 2-ways & correct arrangements
-
Fan working & boosting from every applicable point
-
All lamps, lights fitted and flush with ceiling
-
All blanks fitted & labelled where necessary
-
All accessories level & flush
-
Consumer unit labelled up correctly
-
Test Sheet completed
-
Apartment Photos
-
Installer Test Sheet
Function Test
-
Lighting and Switching
-
Smoke Detectors
-
All sockets
-
MVHR Boost
-
White Good Function
-
Heaters & towel Rads
Test Sheet
-
Test Sheet
-
Issues if applicable
Clashes & Issues
Clashes & Issues
-
Any Clashes or Issues
-
Issues Detailed
-
Photo Evidence