Title Page

  • Site

  • Apartment Number

  • Work Completed By

  • Conducted on

  • Prepared by

  • Comments

  • RNM Supervisor Signature

2nd Fix Checklist

  • All circuits fully 2nd fixed, nothing missing & checked with drawing.

  • All appliances connected

  • All fire and acoustic inserts installed to nominated external & interconnecting fire walls

  • Smoke & heat alarm interconnection tested

  • All lights switching correctly ie: 2-ways & correct arrangements

  • Fan working & boosting from every applicable point

  • All lamps, lights fitted and flush with ceiling

  • All blanks fitted & labelled where necessary

  • All accessories level & flush

  • Consumer unit labelled up correctly

  • Test Sheet completed

  • Apartment Photos

  • Installer Test Sheet

Function Test

  • Lighting and Switching

  • Smoke Detectors

  • All sockets

  • MVHR Boost

  • White Good Function

  • Heaters & towel Rads

Test Sheet

  • Test Sheet

  • Issues if applicable

Clashes & Issues

Clashes & Issues

  • Any Clashes or Issues

  • Issues Detailed

  • Photo Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.