Operating Business EAST MIDLANDS HOMES (EMH)
Region(North/South
Contractor
Contractors Representative
address
Type of property(Void/Tenanted
Documentation (CPP) Job Pack
-
Is the works covered by an F 10 Notification.
-
Is there a copy of the F 10 held on site.
-
Is there a copy of the Employers Liability Insurance held on site.
-
Is a copy of the CPP held on site.
-
Is there a current Risk Assessment and Method statement held on site.
-
Does the operator have access to a dynamic risk assessment document.
-
Is there an up to date signing in sheet held on site.
-
Are appropriate safety and warning notices displayed on site.Does the contractor carry an up to date CSCS card.
-
Does the contractor carry an up to date CSCS card
-
Is there a current up to date Asbestos report held on site.
Welfare Facilities
-
Is there adequate provisions available for the contractors lunch breaks.
-
Does the operative have immediate access to a suitable and sufficient first aid box.
-
Is the contractor familiar with the procedure for an emergency (accident/incident) Ref EMH.
Personnel Protective Equipment (PPE)
-
Does the contractor have the appropriate PPE for the works being carried out.
-
Does the contractor have access to additional PPE if required
COSHH
-
Is there SDS sheets to accompany any hazardous materials that may be used on site.
-
Is there suitable storage facilities for storing hazardous materials that may be used on site. (Paint, Solvents, or others)
-
Are there proper procedures in place for disposing hazardous materials.
-
Does the contractor have access to any specialist PPE if required to comply with COSHH.
Site Conditions
-
Are housekeeping standards acceptable.
-
Are unavoidable site hazards being adequately managed and kept to an acceptable level.
-
Are trailing leads, (trip hazards) being adequately manage.
-
Is the storing of materials being properly managed.
-
Is the tenants welfare and wellbeing, being considered at all times.
-
Is there safe means of access and egress for both tenant and contractor to and from site at all times.
-
Are walkway and paths kept clear at all times.
-
Is the contractor ensuring consideration for surrounding properties regards, dust noise, storing of waste, whilst work is in progress.
Working at Height
-
Are hop up being used, if so are they adequate.
-
Are ladders being used, if so are the adequate and in good repair.
Scaffolding
-
Is there a scaffold register held on site.
-
Is the scaffold inspected every 7 days.
-
Is the current scaff tag signed and up to date.
-
Is access to the scaffold made secure at the end of shift, to prevent any unauthorised persons gaining access on to the scaffold.
Fire Safety Management
-
Is the storages of materials, (fire hazardous materials) kept to a minimum and removed from site ASAP
-
Does the contractor have immediate access to a fire extinguisher in the event of a fire.
-
Are hot works permits (if any) job specific and signed by both parties, No Hot works Permit No hot works.
-
Are all contractors aware of EMH no smoking policy.
Waste management
-
Is all waste materials properly stored and removed from site at the end of the job.
Lone Working
-
Is the contractor familiar with EMH lone working policy.