Information
-
Conducted on 日期:
-
Document No. 報告編號: yyyy -mm
-
BMU No. 吊船編號: [ No. T1-3989.T2-3992.T3-3991.T5-3990.T6-3993]
-
Building Name 大廈名稱: 3 Lung Kui Road,Kowloon
-
Location 位置:Tower 1-6,Beacon Hill, 3 Lung Kui Road,Kowloon
-
Client Name 業主/管業名稱: Kerry Property Management Services Ltd.
-
Contact Person 聯絡人: Engineering Department
-
Contact No. 聯絡號碼: 2191 2998
-
Service Provider: Alimak Group Hong Kong Limited
Unit 05-08, 12/F, Westlands Centre, 20 Westlands Road, Quarry Bay, Hong Kong
Tel: +852 2802 2221 Fax: +852 2824 9626 Email: hongkong@alimakgroup.com
Website: alimakservice.com
Service
Service will be carried out minimum in every three (3) months period 定期保養應每三個月進行一次
1.TROLLEY (Machine Base) 滑輪 (機身底部)
-
1.1 Check wheels and guides 檢查車輪及扣板
-
1.2 Check limit switches (end of trolley, each side) 檢查行車限位制 (兩端)
-
1.3 Check all travel motors and wiring 檢查行車馬達及接線
-
1.4 Check all motor brakes 檢查行車馬達剎車
-
1.5 Check oil level (gearboxes) 檢查變速箱潤滑油
-
1.6 Check articulation, grease if necessary 檢查連接位打油
-
1.7 Check slew operation & grease slew ring if appropriate 檢查轉盤操作及加添潤滑油
-
1.8 Check tension of wheel block support nuts 檢查車輪組件螺絲及收緊
-
1.9 Check slew ring bolt tension 檢查轉盤螺絲及收緊
-
1.10 Torque check on slew ring (every 100 hrs operation or annual) 轉盤螺絲拉磅 (每操作100小時或每年一次)
-
Previous check date 上次檢查曰期
2. JIB 主臂
-
2.1 Check pulleys & rope guides 檢查滑輪及鋼絲線管位
-
2.2 Check limit switches 檢查所有限位制
-
2.3 Check electrical wiring 檢查所有接線
-
2.4 Check hydraulic luffing arm 檢查油壓升降 (油喉接口, 油喉)
-
2.5 Check cross head actuator and wiring 檢查橫桿及接線
-
2.6 Check cross head slew operation, grease if necessary 檢查 橫桿操作及打油
-
2.7 Check knuckle slew ring bolt tension 檢查轉盤螺絲及收緊
-
2.8 Torque check on slew ring (every 100 hrs operation or annual) 轉盤螺絲拉磅 (每操作100小時或每年一次)
-
Previous check date 上次檢查曰期
-
2.9 Extend/retract operation 伸縮操作
-
2.10 Check wire rope/chain mechanism 檢查鋼絲線/鋼鏈活動組件
-
2.11 Check telescope gear condition 檢查伸縮臂齒輪狀態
-
2.12 Check telescope motor condition 檢查伸縮臂摩打狀態
-
2.13 Check telescope of internal wire rope condition. 檢查伸縮臂內鋼纜狀態
-
2.14 Check telescope limit switch and sensor 檢查伸縮臂限制條件狀態
-
2.15 Check the condition of cover plates, steel bolts and nuts. 檢查伸縮臂螺絲及面板狀態
3. CRADLE 吊籠
-
3.1 Check rope fastening points and bulldog clamps 檢查鋼絲鎖扣位置是否緊固
-
3.2 Check limit switch 檢查限位制
-
3.3 Check terminal strips 檢查電源接點
-
3.4 Check wiring 檢查電線
-
3.5 Check general condition of the gondola 檢查吊籠
-
3.6 Check slack rope detectors 檢查鋼絲線限位制
-
3.7 Check buffer rollers 檢查吊籠防撞膠
-
3.8 Check control panel function 檢查控制箱功能
-
3.9 Check control panel condition 檢查控制箱
-
3.10 Check safety hardness anchor bolt 檢查安全帶扣點是否損壞
-
3.11 Check lanyard limit 檢查鎖扣限位制
-
3.12 Check safety lock for safety wire rope
4. ROPES 鋼索
-
4.1 Check hoist ropes and note any unusual wear of damage 檢查鋼絲線情況是否過度磨損
-
4.2 Check diameter of hoist ropes for reduction through wear and record 檢查鋼絲線直徑是否因過度磨損而減少及紀錄
-
4.2 (i) BMU wire rope diameter 鋼絲線直徑 (mm)
-
4.2 (ii) Electric Winch wire rope diameter 鋼絲線直徑 (mm)
-
4.3 Apply grease wire rope 鋼絲線加添潤滑油(每年一次)
5. CONTROL PANEL 控制箱
-
5.1 Check lamps 檢查燈泡
-
5.2 Check wiring 檢查電線
-
5.3 Inspect electrical components 檢查電器零件
-
5.4 Check all functions 檢查所有功能
-
5.5 Check control panel condition 檢查控制箱
6. TRACK 路軌
-
6.1 Check fittings/hold down assemblies 檢查固定螺絲或焊位位置是否損壞
-
6.2 Check condition of runway 檢查行走情況
-
6.3 Check buffer (if applicable) 檢查路軌防撞膠
7. MULTI LAYER DRUM TYPE MACHINES 多排層纜筒
-
7.1 Check wire rope is layering correctly and all guides are aligned properly 檢查鋼絲線是否排行及正常
-
7.2 Check that electrical cable is layering properly (if applicable) 檢查電線排放正常
-
7.3 Check hand brake has adequate lining and is free from grease or oil 檢查手泵打開液壓剎車是否清潔及操作正常
-
7.4 Check primary brake lining and inspect it is free from grease or oil 檢查馬達剎車是否清潔及操作正常
-
7.5 Check tension of all fixing bolts 檢查螺絲及收緊
-
7.6 Torque check on slew ring (every 100 hrs operation or annual) 轉盤螺絲拉磅 (每操作100小時或每年一次)
-
Previous check date 上次檢查曰期
-
7.7 Check cradle may be lowered manually using brake release handle(s) 檢查吊籠是否能使用手動下降
-
7.8 Check hoist motor brake 檢查馬達剎車
-
7.9 Check slip ring contacts, clean if necessary 檢查帶電鋼環接點, 如需清理
-
7.10 Check and test all limit switches 檢查所有限位制
-
7.11 Check hand wheel drive 檢查手動操作
-
7.12 Pull back each cable layering pulley and check both bearings 拉後鋼絲線排行滑輪及檢查軸承
8. MACHINE BODY 機身
-
8.1 Check and test all cam actuated limit switches 檢查限位制
-
8.2 Check auxiliary control 檢查所有操作
-
8.3 Check electrical wiring 檢查電線
-
8.4 Check all grooved pulleys and rope guides檢查滑輪及鋼絲軸
-
8.5 Check oil level (rotation gear motors) 檢查潤滑油 (變速箱)
-
8.6 Check self reeling power cable drum and cable 檢查電線卷筒
-
8.7 Check limit switch (self reeling drum) 檢查電線卷筒限位制
9. RESTRAINT SYSTEM
-
9.1 Check lanyard pin condition 檢查鎖扣
-
9.2 Check connection wire rope and D-ring 檢查連接鋼絲線及扣環
10. This part has to be joint inspected with Client/Property Management’s Representative 此部份須與業主/管業處代表一同檢查及簽名証明
-
10.1 Check if the main power cable is disconnected and the unit is switched off. 檢查主電纜是否收好及主機關掉電源
-
10.2 Check if the unit is put in parking position and cradle tidied down. 檢查主機是否放好, 吊籠是否固定
-
10.3 Check main electrical Panel door closed and locked properly.檢查主電箱是否關好及鎖好
-
10.4 Check cradle electrical Panel door closed and locked properly.檢查吊籠電箱是否關好及鎖好
-
10.5 Check main unit maintenance door closed and locked properly. 檢查主機維修門是否關好及鎖好
-
Checked by (AGHK) 檢查員
-
Date of Issue Form 2 :
-
Date of Issue Form 3 :
-
Date of Issue Form 3 Winch :
-
Date of Issue Form 5 Winch :
11. Summary of Inspections 建議維修或改善事項
-
Item Description 項目說明
-
Attach Related Photos 有關相片
-
Item Description 項目說明
-
Attach Related Photos 有關相片
-
Item Description 項目說明
-
Attach Related Photos 有關相片
-
Item Description 項目說明
-
Attach Related Photos 有關相片
-
Item Description 項目說明
-
Attach Related Photos 有關相片
-
Item Description 項目說明
-
Attach Related Photos 有關相片
12. Signature 簽署
Inspected By (AGHK) 檢查員簽署
-
Signature 簽署:
Client’s Representative Signature 業主/管業處代表簽署
-
Signature 簽署:
Check And Endorsed By (AGHK) 確認人 : Manager / Engineer / Supervisor (for AGHK internal use only)
-
Signature 簽署: