Title Page
-
3 Wanaka Street, Tikipunga - Block G - Practical Completion / Defect Inspection
-
Conducted on
-
Prepared by
-
Location
Overall Site
-
Letterbox Installed
-
letterbox Numbers installed (as per plan & council issued)
-
Development Name / Signage Installed
-
Way Finding Signage Installed
-
Carpark Completed
-
Carpark line marking completed (including numbering)
-
Paths and ramps installed
-
Handrails installed
-
Rubbish / Bin Stores completed
-
Bike Parking completed
-
Landscaping completed (including plants & lawn)
Unit 1.1
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place
Unit 1.2
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place
Unit 1.3
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place
Unit 1.4
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place
Unit 1.5
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place
Unit 1.6
-
Door Numbering
Power
-
Lighting
-
Individual Power Points
-
Fans / Extraction
Water
-
Water is on
-
Shut off valve / tap located
-
Hot water is on and at correct temparature
-
Water pressure is acceptable
Kitchen
-
Appliances installed & operational
-
Benchtop okay
-
All cupboards operational
-
Sink plug is supplied
-
Rangehood operational
-
Paint completed (note defects)
-
Floor coverings completed
Bathroom
-
Vanity installed & no damage
-
Medicine cabinet installed
-
Shower door / curtain in place and not leaking
-
Fan operational
-
Falls on floors correct (if applicable)
-
Toilet roll holder installed
-
Towel holder installed
-
Door hardware (incl lock) works
-
Toilet operational
-
Paint completed (note defects)
-
Floor coverings completed
Lounge / Living Area
-
Heatpump / Heater in place & operational
-
Doors / Ranchslider operational
-
Paint completed (note defects)
-
Floor coverings completed
Laundry
-
Sink / basin operational
-
Hand towel holder installed
-
Hot Water Cylinder installed & operational
-
Doors operational
-
Fan operational
-
Paint completed (note defects)
-
Floor coverings completed
Bedroom 1
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Bedroom 2
-
Lights operational
-
Heating operational (if applicable)
-
Windows operational
-
Wardrobe doors operational
-
Wardrobe shelving in place
-
Door functional & lock / handle working
-
Floor coverings completed
Exterior
-
Decking in place
-
Handrails completed
-
Clothesline installed
-
Lighting operational
-
Paint completed (note defects)
General
-
CCTV in place
-
Power meter in place (incl ICP No)
-
Water meter in place