Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
GDP TLIP1 Review Meeting
-
Meeting time
-
Attendance is taken
-
Key Missing Team Members
-
TTIs are reviewed
-
Counter-measure dates and assignments are updated
-
Counter-measures are showing the desired effect
-
Action Plans are Updated
-
Script-Bs are written for misses and are current
-
Key takeaways from meeting:
Sunrise Metrics Review
-
GISO Sunrise Metrics and action plans updated
-
eSV Sunrise Metrics and action plans updated
-
Turbine Sunrise Metrics and action plans updated
R.A.I.L. (Rolling Action Item List) Review all Value Streams
-
Actions are current
-
Each action has an owner and a date
-
Notes:
Warehouse Check
-
Cycle Count is being performed per the procedure
-
GISO kits for day three are staged
-
Crates are in good / safe condition
-
High racked items are protected w/ baskets or wrapping
-
Items are put away as appropriate
-
Notes:
Incoming Inspection
-
Nothing staged for greater than 72 hours
-
Sample sizes are appropriate to GBT 2828 Standard
-
Inspectors have the right paperwork specs for the items being inspected
-
Inspection failures are marked and are being quarantined effectively
-
Failure are communicated immediately to QA, the Materials Group, and Planning.
-
notes:
Hour by Hour Performance
-
GISO Hour by Hour performance is posted through the current hour
-
eSV Hour by Hour performance is posted through the current hour
-
Turbine Hour by Hour performance is posted through the current hour
-
Notes:
P-Series to MP Series Transition Plan Review
-
Team meeting has been held with cross-locational participation
-
Actions are sufficient for the transition
-
All actions have owners and are time bound
-
Past Due actions are re-forecasted, counter-measured and communicated.
-
Notes:
MBF Checks
-
MBF Counter-measures for the GM are current and are proving effective
-
Notes:
-
Signature of the GM