Information
-
Client
-
Job No.
-
Site Address
-
Conducted on
-
Prepared by
General Safety
General
-
1.01 Is site fencing intact? (No Damage)
-
1.02 Is there a lock on the gate?
-
1.03 All rubbish in designated area?
-
1.04 Has floor been swept? (wide angle photograph to be included)
-
1.05 Has all left over material been stacked neatly?
Pre Internal Linings Inspection
-
1.01 Are cavity sliding units on site?
-
1.02 Are all noggins in place? (if No, take pics of where they are required)
-
1.02.1 Are all cavities clean and wall ties nailed off?
-
1.03 Is there adequate blocking to walls and niches?
-
1.04 Is terrazzo bulkhead completed to standard? (N/A for no bulkhead)
-
1.04.1 Is bulkhead level and straight to the drop off?
-
1.05 Is there adequate blocking to steel beams?
-
1.06 Have steel posts been braced and blocked out with timber?
-
1.07 Is there adequate blocking above stacker or bifold doors for top support?
-
1.08 Have you checked requirement of Bifold door or is track finishing flush with tile level? (if flush finish is required, book concrete cut or check tiling provisions)
-
1.09 Is there adequate blocking for grab rail to stairs and internal steps?
-
1.10 Can fireplace be installed without framework being completed or modified ?(verify fireplace specs and framework detail)
-
1.11 Are nib walls adjacent to kitchen cupboard plumb?<br>
-
1.11.1 Are nib walls in showers plumb?
-
1.11.2 Are all doorways in wind? (visual line check)
-
1.12 Have bulkheads been installed to standard?
-
1.13 Can kitchen be installed without frame amendments? (check kitchen design)
-
1.14 Are all Joists and beams free of notching caused by plumbing stacks?
-
1.16 Have all bracing and triple grips been installed?
-
1.17 Have all shear blocks been installed?
-
1.18 Have double triple grips been installed to truncated girder truss?
-
1.19 Can plywood be installed to top of steel beams to achieve consistent floor level?
-
1.20 Is dwarf wall to void and stairs at correct height?(check handrail selection)
-
1.21 Are Niches located in correct walls to wet areas? (NOTE: no shower head is to face shower screen door)
-
1.23 Has manhole been installed and location been identified?
-
1.24 Have change of direction blocks been installed? (Lower roof/single storey)
-
1.25 Is Electrical rough in complete?
-
1.26 Is Plumbing Rough in complete?
-
1.27 Is A/C Rough In complete?
-
1.28 Ducted vacuuming complete?
-
1.29 Insulation complete?
-
1.30 Have all walls been straightened ready for plasterboard?
Comments
-
1.31 In your opinion is this job ready for plasterboard?
-
Please add any additional information/comments
-
Construction Supervisor Sign off