Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Daily standard work focus assignment
-
Focus area standard work is completed for the specified day
Incoming Inspection
-
All inspectors are present in the inspection area
-
There are no components in incoming inspection for more than 72 hours
-
Sampling conforms to GBT 2828 for acceptance
-
All non-conforming components marked, documented and physically segregated
-
Inspectors have the appropriate drawings and measurement devices for the part being inspected
-
Priority queue has been established for critical component shortages
GISO Review
-
GISO QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
eSV Review
-
eSV QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
Turbine Review
-
Turbine QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
VSX / HSC Review
-
VSX / HSC QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
Red Jacket / SD Review
-
Red Jacket / SD QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
P-Series Review
-
P-Series QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
Impeller Machining Review
-
Impeller Cell QA is on-site and auditing to his Standard Work
-
Yellow Cards and checklists are being used and maintained properly
-
Defect Causes:
-
Standard work instructions for the operators is on the floor for the product being produced
-
Photograph areas that require improvement
-
Morning Check
-
Afternoon Check
-
Notes or Improvement Opportunities:
Product Testing Review
-
Testing sample sizes conforms to GBT 2828
-
Failures are traced back to the original production day and quarantine / resampling is in place
-
Notes:
Signature and Finalization
-
Production Manager -I have completed this assessment to the best of my ability.
-
Select date
-
General Comments / Concerns: