Information

  • Frequency: the X-ray detectors must be verified within 60 minutes following the start up of each shift, at the middle of each shift and at the end of production. Once a day the x-Ray should be checked by passing the three consecutive standards in the center of the detector. Reference Standards: only the standards 1.5mm Ferrous, 1.5mm Non-Ferrous, and 2.0mm Stainless Steel are taken into account for the CCP monitoring. All standards must be passed through the unit individually to monitor their proper detection and rejection. Deviation Procedure: If a critical x-Ray reference standard is not detected or rejected properly you must: 1. STOP THE LINE. 2. All product since the last monitoring must be physically isolated, properly tagged and placed on S HOLD in SAP. 3. Contact your Quality Manager immediately. 4. Product must be passed under a good functioning metal detector or x-Ray. 5. Complete deviation report F-Q-110A. NOTE: in case of detections recorded by a detector during production, complete the DETECTION section.

  • Conducted on

Sig 1

  • Complete the following for each X-ray check.

  • X-Ray Check
  • Product Number

  • Time

  • Type of Check?

  • 3 Consecutive Detections Performed?

  • Metal samples detected?

  • Smallest Standard Value Ceramic size detected?

  • Smallest Standard Value Glass size detected?

  • Metal samples detected?

  • All samples ejection conform?

  • Number of Units Scanned?

  • Number of Units Rejected?

  • Number of False Rejects?

  • Number of True Rejects?

  • Number of Total Rejects?

  • Comments and Corrective Actions

  • Performed by?

Sig 2

  • Complete the following for each X-ray check.

  • X-Ray Check
  • Product Number

  • Time

  • Type of Check?

  • 3 Consecutive Detections Performed?

  • Metal samples detected?

  • Smallest Standard Value Ceramic size detected?

  • Smallest Standard Value Glass size detected?

  • Metal samples detected?

  • All samples ejection conform?

  • Number of Units Scanned?

  • Number of Units Rejected?

  • Number of False Rejects?

  • Number of True Rejects?

  • Number of Total Rejects?

  • Comments and Corrective Actions

  • Performed by?

Sig 3

  • Complete the following for each X-ray check.

  • X-Ray Check
  • Product Number

  • Time

  • Type of Check?

  • 3 Consecutive Detections Performed?

  • Metal samples detected?

  • Smallest Standard Value Ceramic size detected?

  • Smallest Standard Value Glass size detected?

  • Metal samples detected?

  • All samples ejection conform?

  • Number of Units Scanned?

  • Number of Units Rejected?

  • Number of False Rejects?

  • Number of True Rejects?

  • Number of Total Rejects?

  • Comments and Corrective Actions

  • Performed by?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.